Skip to main content

Fraser Crossing Partners chosen for new Pattullo Bridge in Canada

Fraser Crossing Partners consists of Acciona Infrastructure Canada and Aecon Constructors.
By David Arminas February 25, 2020 Read time: 2 mins
Artist impression of planned Pattullo Bridge replacement near Vancouver, Canada (photo courtesy of BC Ministry of Transportation and Infrastructure)

The consortium Fraser Crossing Partners has landed a US$730 million construction contract to expand the Pattullo Bridge in greater Vancouver, Canada.

The bridge will be built alongside the old 1.2km Pattullo Bridge over the Fraser River to connect the cities of New Westminster and Surrey. Construction is scheduled to start in 2020 with completion in late 2023, after which the old bridge will be demolished.

Fraser Crossing Partners consists of Acciona Infrastructure Canada and Aecon Constructors with long-span bridge design by SNC-Lavalin, Leonhardt, Andrä und Partner Beratende Ingenieure, Hatch Corporation, EXP Services and Acciona Infrastructure Canada.

SNC-Lavalin was originally a main partner but withdrew from the main procurement process due to a strategic decision to avoid fixed-price projects. Aecon took its place.

The other two consortia shortlists in early 2019 were Fraser Community Connectors and the Flatiron/Dragados/Carlson Pattullo joint venture.

Fraser Community Connectors consisted of Kiewit Canada Development, Kiewit Infrastructure BC, TY Lin International and International Bridge Technologies.

Flatiron/Dragados/Carlson Pattullo was a JV of Flatiron Constructors Canada, Dragados Canada and Carlson Construction Group, ACS Infrastructure Canada, Hochtieff PPP Solutions North America and Cowi North America.

The design-build-finance contract, awarded by the province British Columbia, is part of $1.08 allocated for the overall project that includes financing, management and property purchases and removal of the old bridge.

The new four-lane bridge also features dedicated pedestrian and cyclist lanes separated from traffic by a barrier on both sides of the bridge.

The existing 1.2km through-arch Pattullo Bridge – named after a provincial premier – was built in 1937. It handles an average of almost 80,000 vehicles a day, about 20% of traffic across the Fraser River. But it has no dividing barrier so the structure has been prone to closures after head-on collisions.

Related Content

  • Fierce competition for Toronto 407 ETR highway expansion contract
    April 24, 2014
    ACS of Spain and Ferrovial are competing for the contract to construct and exploit the second phase of expanding the 407 ETR highway in Toronto, Canada – one of the world’s biggest toll highways. Ferrovial has been managing the 407 ETR highway since 1999 and secured the first phase of its expansion. Currently, ACS and Ferrovial lead two of the three groups invited to present bids for the second phase of the expansion. The third group is headed by Canada's SNC Lavalin, which is Ferrovial's current partner i
  • Final Lower Thames Crossing approval awaited
    November 7, 2022
    Work in the UK includes a twin bore tunnel under the River Thames east of London.
  • Stantec: coming to an infrastructure site near you
    April 13, 2017
    Acquisitive Canadian firm Stantec is snapping up more transportation expertise as it moves out of its home North American market. David Arminas reports. Last December, politicians from the US states of Kentucky and Indiana celebrated the opening of the second of two major bridges. A ribbon-cutting ceremony took place in cold wintry weather on the new 762m-long cable-stayed Lewis and Clark Bridge. The event marked the finish of the prestigious three-and-half-year Ohio River Bridges Project.
  • New bridge link for Oregon-Washington
    April 25, 2012
    The US Department of Transportation has given the go-ahead for the I-5 Columbia River Crossing project, which will link Washington and Oregon states. The plans involve replacing the existing Interstate 5 Columbia River Crossing Bridges and building a new interstate transit link.