Skip to main content

First phase of Houston reversible HOV to HOT lanes completed

Houston’s Metropolitan Transit Authority of Harris County (Metro) working with prime contractor TransCore has commissioned the first of five reversible high occupancy toll (HOT) lane corridors. One of the most substantial undertakings of its kind to date in the United States, Metro’s conversion of high occupancy vehicle (HOV) lanes to HOT lanes will increase utilisation of the HOV system and subsequently relieve congestion in the general purpose freeway lanes. When completed, the programme will span 135k
April 19, 2012 Read time: 3 mins
Houston’s Metropolitan Transit Authority of Harris County (5067 Metro) working with prime contractor TransCore has commissioned the first of five reversible high occupancy toll (HOT) lane corridors. One of the most substantial undertakings of its kind to date in the United States, Metro’s conversion of high occupancy vehicle (HOV) lanes to HOT lanes will increase utilisation of the HOV system and subsequently relieve congestion in the general purpose freeway lanes.

When completed, the programme will span 135kms throughout Houston, the fourth largest city in the United States and the largest city in Texas. The IH-45 South Gulf Freeway is the first corridor in Metro’s HOV network to undergo the transformation with construction of the remaining US 59 South, IH-45 North, US 290 and US 59 North corridors to be completed by the end of 2012.

Single-occupant vehicles (SOV) will be permitted to access the HOV lanes for a variable-priced toll ranging from $1 to $4.50, based on the time of day and level of congestion. Toll amounts are posted in advance of each entrance ramp and collected through all electronic tolling (AET). SOV’s equipped with a valid toll transponder issued by Metro, or any other Texas tolling authority, are permitted to use the lanes. The HOT system is also fully interoperable with all Texas tolling authorities, allowing seamless passage on any toll facility in the State for more than 9.4 million Texas vehicles currently equipped with toll transponders.

Inbound lanes are currently accessible to SOV’s Monday through Friday from 5 a.m. to 11 a.m., except for the 7-8 a.m. peak hour when the lanes are HOV-only. Outbound lanes are available to SOV’s weekdays from 1 p.m. to 8 p.m., except for the 4 p.m. to 6 p.m. peak HOV-only timeframe. The HOT lanes will now be reversed from the inbound to outbound direction using a new automated reversible gate operation (ARGO) system that was deployed as part of the conversion effort. The ARGO system is an industry first-of-its-kind and size, allowing Metro to remotely monitor and efficiently control access and egress throughout the entire HOT network from the area’s multi-agency traffic management centre, Houston TranStar.

In addition to serving as the prime contractor for the system design and installation of the HOT and ARGO systems, TransCore is also contracted to provide turnkey lane, roadway, and back office operation and maintenance services for the two systems over the next six years. Overall, Metro’s HOV to HOT conversion encompasses 108 toll lanes, a storefront and customer service centre, back-office systems, and more than 100 dynamic message signs (DMS), 200 closed circuit television (CCTV) cameras, 200 vertical and swing gates, 7 vertical restraining barriers, and numerous other traffic control devices, all fully integrated and centrally controlled from Houston TranStar.

The HOT system is all-electronic, complete with an automatic violation enforcement system and customised HOV occupancy enforcement solution. Tolls can be calculated and collected using either dynamic or time-of-day pricing. The programme will incorporate TransCore’s radio frequency identification (RFID) eGo Plus windshield sticker tag and Encompass 6 reader that are interoperable with all tolling agencies throughout the state of Texas.

TransCore has been a system integrator, operator, and maintenance provider for some of Houston’s largest transportation initiatives for more than 20 years. Nationally, TransCore has supported HOT lane deployments for the nation’s first HOT installation on I-15 in San Diego as well as Miami’s I-95 Express, Seattle’s SR 167, and Utah’s I-15 in Salt Lake City.

For more information on companies in this article

Related Content

  • Upgrades underway for Tarrant tollway in Texas
    September 20, 2013
    Financing has been found to fund construction work on the North Tarrant Express (NTE) in Texas. The public-private partnership project for Segment 3A of the route will be carried out by NTE Mobility Partners Segments 3 LLC (NTEMP3). The rebuilding of the I-35W road close to Fort Worth will help reduce traffic congestion on the route at peak periods. The public-private partnership has been agreed between NTEMP3, the Texas Department of Transportation (TxDOT) and the North Central Texas Council of Governments
  • RMD formwork for Qatar’s tallest bridge on Doha East Corridor
    July 6, 2016
    RMD Kwikform will be supplying tens of thousands of tonnes of its formwork and shoring for construction of Qatar’s tallest bridge on the Doha East Corridor project As well as the bridge, the Corridor contract comprises four interchanges at a total cost of US$612.5 million. Ashghal, Qatar's Public Works Authority, awarded the Corridor project to China Harbour Engineering Design and Construction. Built as a five-lane 11km bypass in Doha, the capital of Qatar, the project will also cater for a rail line
  • Traffic congestion plan for Delhi
    April 26, 2012
    India's capital Delhi looks set to see the introduction of a congestion charging scheme. The city authorities plan to launch the scheme in a bid to tackle endemic traffic congestion.
  • British Columbia issues RFQ for US$2.7 billion Massey Bridge
    June 30, 2016
    Canada’s provincial British Columbia government has issued a request for qualification for construction of a US$2.7 billion bridge over the Fraser River around the city of Vancouver. The 10-lane bridge will be built under a 30-year public-private partnership agreement and will include tolled transit lanes and related Highway 99 improvements between Bridgeport Road in the adjacent city of Richmond and Highway 91 in the city of Delta. The 60-year-old tunnel now carries its limit of 80,000 vehicles a day an