Skip to main content

First phase of Houston reversible HOV to HOT lanes completed

Houston’s Metropolitan Transit Authority of Harris County (Metro) working with prime contractor TransCore has commissioned the first of five reversible high occupancy toll (HOT) lane corridors. One of the most substantial undertakings of its kind to date in the United States, Metro’s conversion of high occupancy vehicle (HOV) lanes to HOT lanes will increase utilisation of the HOV system and subsequently relieve congestion in the general purpose freeway lanes. When completed, the programme will span 135k
April 19, 2012 Read time: 3 mins
Houston’s Metropolitan Transit Authority of Harris County (5067 Metro) working with prime contractor TransCore has commissioned the first of five reversible high occupancy toll (HOT) lane corridors. One of the most substantial undertakings of its kind to date in the United States, Metro’s conversion of high occupancy vehicle (HOV) lanes to HOT lanes will increase utilisation of the HOV system and subsequently relieve congestion in the general purpose freeway lanes.

When completed, the programme will span 135kms throughout Houston, the fourth largest city in the United States and the largest city in Texas. The IH-45 South Gulf Freeway is the first corridor in Metro’s HOV network to undergo the transformation with construction of the remaining US 59 South, IH-45 North, US 290 and US 59 North corridors to be completed by the end of 2012.

Single-occupant vehicles (SOV) will be permitted to access the HOV lanes for a variable-priced toll ranging from $1 to $4.50, based on the time of day and level of congestion. Toll amounts are posted in advance of each entrance ramp and collected through all electronic tolling (AET). SOV’s equipped with a valid toll transponder issued by Metro, or any other Texas tolling authority, are permitted to use the lanes. The HOT system is also fully interoperable with all Texas tolling authorities, allowing seamless passage on any toll facility in the State for more than 9.4 million Texas vehicles currently equipped with toll transponders.

Inbound lanes are currently accessible to SOV’s Monday through Friday from 5 a.m. to 11 a.m., except for the 7-8 a.m. peak hour when the lanes are HOV-only. Outbound lanes are available to SOV’s weekdays from 1 p.m. to 8 p.m., except for the 4 p.m. to 6 p.m. peak HOV-only timeframe. The HOT lanes will now be reversed from the inbound to outbound direction using a new automated reversible gate operation (ARGO) system that was deployed as part of the conversion effort. The ARGO system is an industry first-of-its-kind and size, allowing Metro to remotely monitor and efficiently control access and egress throughout the entire HOT network from the area’s multi-agency traffic management centre, Houston TranStar.

In addition to serving as the prime contractor for the system design and installation of the HOT and ARGO systems, TransCore is also contracted to provide turnkey lane, roadway, and back office operation and maintenance services for the two systems over the next six years. Overall, Metro’s HOV to HOT conversion encompasses 108 toll lanes, a storefront and customer service centre, back-office systems, and more than 100 dynamic message signs (DMS), 200 closed circuit television (CCTV) cameras, 200 vertical and swing gates, 7 vertical restraining barriers, and numerous other traffic control devices, all fully integrated and centrally controlled from Houston TranStar.

The HOT system is all-electronic, complete with an automatic violation enforcement system and customised HOV occupancy enforcement solution. Tolls can be calculated and collected using either dynamic or time-of-day pricing. The programme will incorporate TransCore’s radio frequency identification (RFID) eGo Plus windshield sticker tag and Encompass 6 reader that are interoperable with all tolling agencies throughout the state of Texas.

TransCore has been a system integrator, operator, and maintenance provider for some of Houston’s largest transportation initiatives for more than 20 years. Nationally, TransCore has supported HOT lane deployments for the nation’s first HOT installation on I-15 in San Diego as well as Miami’s I-95 Express, Seattle’s SR 167, and Utah’s I-15 in Salt Lake City.

For more information on companies in this article

Related Content

  • Ferrovial, Acciona among Bentley winners
    November 22, 2022
    Finalists presented their projects at Bentley’s recent Going Digital Awards event in London.
  • Digital cameras and VMS improve London and Scottish road safety
    March 18, 2016
    London and Scotland are using VMS and digital cameras to successfully lower road deaths. Road safety measures such as variable message signs (VMS) and digital cameras have boosted road safety in the UK capital London and also in the Scottish Highlands. And the systems need not be a drain on electricity supplies. Full matrix driver information signs from SWARCO Traffic, one of the UK’s leading traffic management technology providers, are being installed for the first time across the Transport for London (TfL
  • Golden opportunities in the MINT - Mexico, Indonesia, Nigeria, Turkey
    May 21, 2015
    Mexico, Indonesia, Nigeria, Turkey – Global Report offers up some food for thought about where smart money might be headed within the next several years – David Arminas writes China’s rate of growth may be slowing down, but other South East Asian companies are being quick to offer alternate investment opportunities, notably Indonesia. Nigeria, too, has had issues with security of investment. But there are signs that the government may be getting serious at last about tightening up rules and regulation
  • RMD formwork for Qatar’s tallest bridge on Doha East Corridor
    July 6, 2016
    RMD Kwikform will be supplying tens of thousands of tonnes of its formwork and shoring for construction of Qatar’s tallest bridge on the Doha East Corridor project As well as the bridge, the Corridor contract comprises four interchanges at a total cost of US$612.5 million. Ashghal, Qatar's Public Works Authority, awarded the Corridor project to China Harbour Engineering Design and Construction. Built as a five-lane 11km bypass in Doha, the capital of Qatar, the project will also cater for a rail line