Skip to main content

First half of Renfrew Bridge arrives by barge

VIDEOS: Graham Construction is building the swing Renfrew Bridge for Renfrewshire Council, Scotland, as part of the €137m Clyde Waterfront and Renfrew Riverside development project.
By David Arminas May 10, 2024 Read time: 2 mins
The furstr half of 184m-long cable-stayed twin-leaf bridge passing under the Erskine Bidge in Scotland (image courtesy Graham Construction/Renfrew Council)

The first half of a new swing bridge over the River Clyde in Renfrew, has arrived on site by barge from the Netherlands.

Principal contractor Graham Construction is building the Renfrew Bridge for Renfrewshire Council as part of the €137m Clyde Waterfront and Renfrew Riverside development project.

The 184m-long cable-stayed twin-leaf bridge will carry a two-lane road connecting Renfrew with Yoker and Clydebank over the River Clyde.

Graham Construction said the south section of the bridge sailed up the River Clyde after completing a seven-day barge trip from the Netherlands, via the English Channel and up the Irish sea to reach the west coast of Scotland.

Graham’s team will install the first section on the Renfrew side of the river at Meadowside Street, ahead of the north section of the bridge arriving next month. It will be fixed into place at Dock Street in Yoker.

Renfrewshire Council has said that the bridge should be open ahead of schedule for pedestrians, cyclists and motorists by the end of this year.

The bridge was manufactured by Hollandia Infra in the small industrial town of Krimpen aan den Ijssel on the Nieuwe Masse, a tributary of the Rhine River in Dutch province of South Holland.

Due to its length and weight of 1,600tonnes, lifting required three floating cranes, Matadors, from Rotterdam-based heavy lifting specialist Bonn & Mees. Using SPMTs – self-propelled modular transporters - the bridge was brought into load-out position along the quay where the three Matador cranes took over the weight and maneuvered the bridge onto the pontoon, supplied by heavy transportation and lift specialist Sarens.

For more information on companies in this article

Related Content

  • Manitowoc crane helps construct new Illinois bridge
    December 15, 2017
    A barge-mounted crane from Manitowoc is playing a key role in a major Illinois bridge replacement project. The machine is being used by Kraemer North America, which is replacing an 84-year-old truss bridge near Savanna, Illinois. The firm is employing a barge-mounted MLC300 equipped with the sophisticated variable position counterweight (VPC) technology, which is said to allow the MLC300 to adjust its counterweight during each lift and keep the barge stable while lifting. When Manitowoc introduced its VPC
  • Riga's newest bridge improved traffic flow
    April 11, 2012
    An alliance of companies has come together to realise major infrastructure projects in Latvia including its biggest bridge. Patrick Smith reports. Riga, the Latvian capital, has the finest collection of Art Nouveau buildings in Europe and its centre is on the UNESCO World Heritage List.
  • Riga's newest bridge improved traffic flow
    May 9, 2012
    An alliance of companies has come together to realise major infrastructure projects in Latvia including its biggest bridge. Patrick Smith reports. Riga, the Latvian capital, has the finest collection of Art Nouveau buildings in Europe and its centre is on the UNESCO World Heritage List. The city of some 750,000 people (the country's total population is 2.2 million) is bounded to the south by Lithuania and to the north by Estonia, and is the second largest in Baltic States. To the east is Russia and Belarus.
  • The Mersey Gateway bridge project continues on schedule
    October 18, 2016
    Work continues on the 2.3km Mersey Gateway signature bridge project close to Liverpool in the UK. David Arminas reports on some of the construction highlights. Under construction is a cable-stayed structure with three towers that will span the Mersey River’s expansive mud flats between the towns of Runcorn and Widnes near Liverpool. Including the approach viaducts on each side, it will be 2.3km long with a river span of 1km. The main bridge deck will be reinforced concrete. The 80m-high central tower will b