Skip to main content

FHWA’s weather guidelines for road users

The tremendous growth in the amount of available weather and road condition information—including devices that gather weather information, models and forecasting tools for predicting weather conditions, and electronic devices used by travellers — has led the Federal Highway Administration (FHWA) to develop effective and specific guidelines for communicating road weather information in a way that is consistent with what travellers need, want, and will use when making travel decisions.
August 21, 2012 Read time: 2 mins
The tremendous growth in the amount of available weather and road condition information—including devices that gather weather information, models and forecasting tools for predicting weather conditions, and electronic devices used by travellers — has led the 2410 Federal Highway Administration (FHWA) to develop effective and specific guidelines for communicating road weather information in a way that is consistent with what travellers need, want, and will use when making travel decisions.

This project, Testing and Evaluation of Preliminary Design Guidelines for Disseminating Road Weather Advisory & Control Information, builds upon the earlier Human Factors Analysis of Road Weather Advisory and Control Information project which was initiated to assist transportation officials in communicating both pre-trip and enroute road weather information effectively, consistently, and timely to meet the needs of travellers for different weather conditions and travel scenarios. This earlier project resulted in preliminary guidelines.

For the current 122-page publication, these preliminary guidelines were disseminated to a broad group of transportation and road weather officials for review and use.

These reviewers included staff from private agencies and State Department of Transportation (DoT) staff working at traffic management centres. Evaluation of the guidelines followed through end user surveys, on-site interviews and discussions, and application of the preliminary guidelines to assess their suitability and effectiveness for traffic operations. Valuable feedback provided by these end users was used to modify the preliminary guidelines and develop the revised guidelines.

The 122-page report can be downloaded from this link: %$Linker: External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal http://ntl.bts.gov/lib/45000/45600/45623/FinalPackage_JPO-12-046_V1.pdf 122-page report false http://ntl.bts.gov/lib/45000/45600/45623/FinalPackage_JPO-12-046_V1.pdf false false%>

For more information on companies in this article

Related Content

  • NDT sensor fusion in structural pavement condition surveys
    February 27, 2017
    Early detection of pavement defects and the causes of deterioration is essential for effective maintenance planning, writes Dr Alena Uus* There is a need for optimisation and development of UK highway survey methods that would provide comprehensive information on the surface and subsurface pavement condition and operate at traffic speed, which eliminates the requirement for lane closures. Performance of non-destructive testing (NDT) methods commonly employed in pavement condition surveys can be potent
  • Recycled pavement use rises again in the US, according to NAPA
    January 16, 2015
    The use of reclaimed asphalt pavement in the United States increased during 2013 after two years of no rise, according the latest report from the US National Asphalt Pavement Association (NAPA). The report found that more than 73 million tons of reclaimed asphalt pavement and 1.7 million tons of reclaimed asphalt roofing shingles were used in new asphalt pavement mixes in the United States during in 2013. Using recycled asphalt material saved about $2 billion in 2013 over the use of virgin materials,
  • New grants under Highways for Life Technology Partnerships Programme
    April 24, 2012
    The US Federal Highway Administration (FHWA) yesterday launched a solicitation under its Technology Partnerships programme that aims to help highway industry innovations make the leap from promising prototypes to market-ready products. Each grant award will range from US$250,000 to $1,000,000 for up to two years of performance, to fund the critical final steps in developing technologies with potential to improve highway quality and safety or reduce construction congestion. The programme also promotes partne
  • VIDEO footage shows bridge replacement project in Rhode Island
    October 10, 2014
    A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. Rhode Island Department of Transportation (RIDOT) partnered with EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full constru