Skip to main content

Fehmarn start for Germany

The Fehmarn Belt Fixed Link will cut journey times between Copenhagen and Hamburg.
By David Arminas December 8, 2021 Read time: 1 min
Cars will take an estimated 10 minutes and trains seven minutes to go through the 18km tunnel (image courtesy Femern A/S)

Construction of the €7 billion (US$8.21 billion) Baltic Sea tunnel has begun on the German side of mega-project that will connect the Danish capital Copenhagen and Hamburg.

The tunnel will run between Lolland, Denmark’s fourth largest island, and the German island of Fehmarn off the eastern coast of Germany’s Schleswig-Holstein state.

The Fehmarn Belt Fixed Link will drastically cut road and rail train journey times between the two cities when it is completed in 2029. Government and construction officials met near the village of Puttgarden on Fehmarn for a sod-turning ceremony. Work has already started on the Danish side, on the island of Lolland.

Danish firm Femern A/S, in charge of the project, says it will be the world's longest road and rail tunnel. Cars will take an estimated 10 minutes and trains seven minutes to go through the 18km tunnel.

The tunnel will consist of 79 standard 217m-long elements around 10m high with two highway tubes, one emergency tube and two rail tubes. There will be 10 service elements, each 85.7m-long but both wider and higher and with a subfloor to house technical and servicing equipment. The deepest section of the Fehmarn Belt Trench, into which the tunnel elements will be laid, will be 35m.

For more information on companies in this article

Related Content

  • Denmark reconsiders a Kattegat link
    May 10, 2023
    A bridge would cross the Kattegat Strait between the Jutland peninsula city of Aarhus - Denmark’s second largest city after the capital Copenhagen - and Kalundborg, a small city of 17,000 on the western shore of Zealand Island.
  • Denmark eyes Little Belt Fixed Link
    November 8, 2023
    The directorate is concerned that the so-called New Little Bridge, which opened in 1970, will suffer severe traffic congestion from 2030 onwards.
  • Fehmarn Belt Tunnel opening set for mid-2029
    August 16, 2024
    Around 1,500 tonnes of reinforcement for casting the concrete tunnel elements are produced weekly for the 17.6km Fehmarn Belt Tunnel that will connect the Danish island of Lolland with the German island of Fehmarn.
  • Contracts are about to be signed for the Fehmarnbelt Fixed Link
    March 13, 2015
    Nearly eight years after Denmark and Germany agreed to construct a major undersea road and rail tunnel, the first contracts are about to be signed. David Arminas reports. Construction is due to start later this year on one of Europe’s most ambitious, as well as the world’s longest, road and rail tunnels, the 17.6km Fehmarnbelt Fixed Link between Germany and Denmark. Fehmarnbelt is expected to cost around US$7.5 billion and be five times the length of the Øresund tunnel between the Danish capital Copenhagen