Skip to main content

Faroes’ Streymoy-to-Sandoy Tunnel opens

The 10.8km-long Sandoy Tunnel connecting the islands of Streymoy and Sandoy opened in mid-December and is the longest subsea tunnel in the Faroe Islands.
By David Arminas January 23, 2024 Read time: 2 mins
The Sandoy Tunnel crosses the Skopunarfjørður – the strait between Sandoy and Streymoy islands – connecting the port of Gamlarætt on Streymoy to Traðardalur in central Sandoy, south of Streymoy Island (image couirtesy NCC)

Drivers in the Faroe Islands were using the recently opened Sandoy Tunnel for free for the first 23 days of operation.

The 10.8km-long tunnel connecting the islands of Streymoy and Sandoy opened in mid-December and is the longest subsea tunnel in the Faroe Islands and one of the longest in the world, according to the island group’s ministry of transport. The contractor, Swedish infra group NCC, notes that the tunnel is 9.5m wide and has a lowest point at 147m with a gradient of 5%,

The Sandoy Tunnel crosses the Skopunarfjørður – the strait between Sandoy and Streymoy islands – connecting the port of Gamlarætt on Streymoy to Traðardalur in central Sandoy, south of Streymoy Island. Ferry service between Gamlarætt on Streymoy and Skopun on Sandoy has now been cancelled.

Construction began on both sides of the project in June 2019 and the two teams met in February 2022. The cost of Sandoyartunnilin has been around US$127 million.

"The tunnel offers the best of both worlds,” said the Faroe Island prime minister Aksel Johannesen during the opening ceremony. “Access to the vibrancy of city life and the tranquillity of small village communities.”

Some financing for construction and operation of the Sandoy Tunnel will come from toll revenue from the 11.4km-long Eysturoyartunnilin that opened in December 2019. It links Streymoy and Eysturoy islands and has 10 times the estimated traffic that is likely to use Sandoy Tunnel.

The Faroes government tunnel operator P/F Tunnil has estimated that 300–400 vehicles per day will use the Sandoy Tunnel. Average daily ridership of the ferry route was 195 vehicles.

Meanwhile, work continues by the Czech construction firm Metrostav on a 1.2km tunnel on Suðuroy Island to connect the villages of Fámjin and Ørðavík. Less than 90 people live in the area but the road connection has been poor and often closed during bad weather.

For more information on companies in this article

Related Content

  • Nepal road tunnel work commencing
    October 25, 2019
    Construction work is commencing on the Nepal First Tunnel Road project.
  • New roads to connect Slovakia and Czech Republic
    February 26, 2014
    New road links are planned to connect Slovakia and its neighbour, the Czech Republic. The Slovak Ministry of Transport stated that by 2020 two new routes are planned to link the countries. The R6 expressway will run from Puchov in Slovakia and connect the Trencin region with Zlin in the Czech Republic. Meanwhile the R5 expressway will run from Svrcinovec in Slovakia and link the country’s Zilina regions with the Morava-Sliezsko region in the Czech Republic. Construction for the R6 project is expected to sta
  • Papua New Guinea mends its bridges
    February 28, 2022
    Under the latest tranche of the Sustainable Highlands Highway Investment Programme, 45 of the estimated 71 bridges will be completely replaced.
  • UGL wins Australia’s NorthConnex M&E services contract
    September 7, 2015
    Engineering services provider UGL has signed a four-year deal with the Lend Lease Bouygues joint venture that is building the NorthConnex motorway in Sydney, Australia. The US$329 million contract is for the design, procurement, construction and commissioning of the electrical, mechanical, communication, fire and control systems needed for the project’s 9km twinned tolled tunnel. UGL provides outsourced engineering, asset management and maintenance services to rail, transport, power, resources, water an