Skip to main content

Experts call for road pricing instead of a ring road for Copenhagen

Danish traffic experts are urging politicians in Copenhagen to opt for road pricing instead of the planned ring road. They point out that GPS-based road pricing is more cost efficient than a ring road, and can be introduced in just three to five years.
April 24, 2012 Read time: 1 min
Danish traffic experts are urging politicians in Copenhagen to opt for road pricing instead of the planned ring road. They point out that GPS-based road pricing is more cost efficient than a ring road, and can be introduced in just three to five years. It would also be a fairer system since the fees will be determined by both traffic congestion and distance. Harry Lahrmann, lecturer at 5189 Aalborg University concludes that a ring road will mostly affect those living outside it who have errands within the city, and will not necessarily reduce CO2 emissions. Road pricing will however reduce emissions since it will cut the volume of traffic.

Meanwhile, the Danish transport minister is expected to take measures to reintroduce a scheme that allows electric cars to park free of charge in Copenhagen. The exemption from parking regulations for electric cars had to be discontinued on 1 December 2011 as it proved to be illegal. The new regulations are expected to be introduced in the first half of 2012.

For more information on companies in this article

Related Content

  • Contracts are about to be signed for the Fehmarnbelt Fixed Link
    March 13, 2015
    Nearly eight years after Denmark and Germany agreed to construct a major undersea road and rail tunnel, the first contracts are about to be signed. David Arminas reports. Construction is due to start later this year on one of Europe’s most ambitious, as well as the world’s longest, road and rail tunnels, the 17.6km Fehmarnbelt Fixed Link between Germany and Denmark. Fehmarnbelt is expected to cost around US$7.5 billion and be five times the length of the Øresund tunnel between the Danish capital Copenhagen
  • Contracts are about to be signed for the Fehmarnbelt Fixed Link
    March 13, 2015
    Nearly eight years after Denmark and Germany agreed to construct a major undersea road and rail tunnel, the first contracts are about to be signed. David Arminas reports. Construction is due to start later this year on one of Europe’s most ambitious, as well as the world’s longest, road and rail tunnels, the 17.6km Fehmarnbelt Fixed Link between Germany and Denmark. Fehmarnbelt is expected to cost around US$7.5 billion and be five times the length of the Øresund tunnel between the Danish capital Copenhagen
  • Carry on Movin’ On - Michelin’s mobility event
    October 15, 2018
    Many of the great and the good in the global mobility sector gathered at this year’s Movin’ On event in Montreal. Measured regulation of technologies and safety issues were major themes, reports David Arminas Autonomous vehicles, platooning, smart intersections and safety – these were the talking points over two and half days of the Movin’ On event in Montreal. Everyone in the mobility sector is at the same point, trying to see what mobility will look like in the future. Apparent at the event was just
  • New Central Ring Road around Moscow to be built by 2018
    September 30, 2013
    Eugene Gerden evaluates Moscow’s new ring road mega project The Russian government plans to complete implementation of one of the most ambitious projects in the country’s road building industry in recent years, which involves construction of The Central Ring Road around Moscow by 2018. The new road should be built by the next presidential elections, while its length will be 339km. It is expected to be comprised of five sections and will be located 50km away from Moscow Ring Road, a ring road encircling the