Skip to main content

Elonroad’s electric road and recharging lane for buses in Lund

Sweden’s Transport Administration (Trafikverket) has awarded a contract to the Elväg Syd consortium for an electric and recharging bus lane in the city of Lund. The demonstration area will be built in the bus lane along 1km of Getingevägen Road near central Lund. Construction will begin during the first quarter of 2020 and last for three years. The project’s budget is €9.3 million of which Trafikverket will contribute €8.3 million with the other consortium players supplying the remaining funds. Lun
April 17, 2019 Read time: 3 mins

Sweden’s Transport Administration (1096 Trafikverket) has awarded a contract to the Elväg Syd consortium for an electric and recharging bus lane in the city of Lund.

The demonstration area will be built in the bus lane along 1km of Getingevägen Road near central Lund. Construction will begin during the first quarter of 2020 and last for three years.

The project’s budget is €9.3 million of which Trafikverket will contribute €8.3 million with the other consortium players supplying the remaining funds.

Lund is a historic town of around 91,000 people with cobbled streets and home to Lund University, one of Sweden’s oldest educational institutes. The city also has one of Europe’s most developed cycling infrastructure. There are 4,800 bike parking spaces in the town, including a multi-storey facility at the railway station, more than 260km of bicycle paths and lanes. The government estimates that around 43% of journeys within the city are by bicycle.

The Elväg Syd consortium, which includes state, educational and private sector players, will use technology developed by one of the consortium members, Elonroad. Other members are Innovation Skåne coming on board as project manager, Kraftringen Energi, Lund municipality, Lund University of Technology, Skånetrafiken, Solaris Sverige and Sweden’s National Road and Transport Research Institute (7264 VTI).

The test road is based on a 200m long test track set up outside Lund in 2017 (see video). Elonroad’s concept involves a conductive rail - 5cm high and 30cm wide - laid on top of the asphalt or concrete road surface. The rail acts as a recharging infrastructure for electric vehicles with electric motors and batteries – although the Lund test site will be for only buses. The rail also has inclined sides to make it smooth for vehicles when drivers change lanes.

The rail consisting of short grounded segments are arranged along a single track. Every second segment can switch to positive when a car passes over it. Three contactors will supply a steady current rectified with diodes before charging the battery.

Rainwater passes under the road. During winter, snow can be removed by a special plow developed by Elonroad. Ice on the top surface of the rail will be melted by a heating system. A grounded strip will stop leaking current from the positive segment under the vehicle.

When the driver exits the rail system, the vehicle’s batteries take over for non-electric roads. Batteries take over automatically at exits and roundabouts.

For more information on companies in this article

Related Content

  • How safe is safe?
    February 7, 2024
    When it comes to vehicle restraint systems, just how safe it safe? Attendees to the 3rd International Conference on Road Safety, put on by the ERF - European Union Road Federation – found out, reports David Arminas.
  • Indra Sistemas joins European Commission’s study Harmony
    December 19, 2017
    Spanish global IT business Indra Sistemas is to join Harmony, a pan-European multimodal transport connectivity study. Harmony aims to develop technologies for integrating real-time data from different transport users and operators to improve multimodal information services. Indra will be focussed on a pilot project in Madrid, developed with the Polytechnic University of Madrid. Indra is working with research groups G@TV and TranSYT from the Polytechnic University of Madrid along with support from Grupo
  • Finland ploughs ahead with a planned Hailuoto causeway
    May 8, 2018
    Finland’s planned 8km Hailuoto Causeway is likely to cost around €74 million, according to the North Ostrobothnia Centre for Economic Development, Transport and the Environment.
  • Chinese firms now offering all-electric cars
    June 21, 2013
    Chinese firms Geely Automotive and Kandi have jointly developed an all-electric vehicle. The JL7001BEV model has won official approval from China’s Ministry of Industry and Information Technology. This is of note as it means Chinese buyers of the vehicle will be able to benefit from several national and local subsidies and incentives for EVs. The new JL7001BEV model is among those on the lists of Approved Vehicles. The Chinese authorities are keen to encourage customers to buy more electric vehicles in a bi