Skip to main content

Elonroad’s electric road and recharging lane for buses in Lund

Sweden’s Transport Administration (Trafikverket) has awarded a contract to the Elväg Syd consortium for an electric and recharging bus lane in the city of Lund. The demonstration area will be built in the bus lane along 1km of Getingevägen Road near central Lund. Construction will begin during the first quarter of 2020 and last for three years. The project’s budget is €9.3 million of which Trafikverket will contribute €8.3 million with the other consortium players supplying the remaining funds. Lun
April 17, 2019 Read time: 3 mins

Sweden’s Transport Administration (1096 Trafikverket) has awarded a contract to the Elväg Syd consortium for an electric and recharging bus lane in the city of Lund.

The demonstration area will be built in the bus lane along 1km of Getingevägen Road near central Lund. Construction will begin during the first quarter of 2020 and last for three years.

The project’s budget is €9.3 million of which Trafikverket will contribute €8.3 million with the other consortium players supplying the remaining funds.

Lund is a historic town of around 91,000 people with cobbled streets and home to Lund University, one of Sweden’s oldest educational institutes. The city also has one of Europe’s most developed cycling infrastructure. There are 4,800 bike parking spaces in the town, including a multi-storey facility at the railway station, more than 260km of bicycle paths and lanes. The government estimates that around 43% of journeys within the city are by bicycle.

The Elväg Syd consortium, which includes state, educational and private sector players, will use technology developed by one of the consortium members, Elonroad. Other members are Innovation Skåne coming on board as project manager, Kraftringen Energi, Lund municipality, Lund University of Technology, Skånetrafiken, Solaris Sverige and Sweden’s National Road and Transport Research Institute (7264 VTI).

The test road is based on a 200m long test track set up outside Lund in 2017 (see video). Elonroad’s concept involves a conductive rail - 5cm high and 30cm wide - laid on top of the asphalt or concrete road surface. The rail acts as a recharging infrastructure for electric vehicles with electric motors and batteries – although the Lund test site will be for only buses. The rail also has inclined sides to make it smooth for vehicles when drivers change lanes.

The rail consisting of short grounded segments are arranged along a single track. Every second segment can switch to positive when a car passes over it. Three contactors will supply a steady current rectified with diodes before charging the battery.

Rainwater passes under the road. During winter, snow can be removed by a special plow developed by Elonroad. Ice on the top surface of the rail will be melted by a heating system. A grounded strip will stop leaking current from the positive segment under the vehicle.

When the driver exits the rail system, the vehicle’s batteries take over for non-electric roads. Batteries take over automatically at exits and roundabouts.

For more information on companies in this article

Related Content

  • Engine innovation for diesels and electrics
    October 2, 2018
    Engine firms continue to develop new power solutions and refine existing technologies - Mike Woof writes There has been strong pressure against internal combustion engines worldwide, with the scandal over the emissions from diesel powered private cars has strengthening opinion against these engines. Diesel engine firms are taking the long view by offering future power options such as alternative fuels and electric systems. The engine builders are also hard at work ensuring that power units for the indust
  • Clear sailing illuminated road studs from Clearview Intelligence
    January 31, 2017
    Clearview Intelligence reports that its lighted road stud system for the A720 Sheriffhall Roundabout in Edinburgh, Scotland has picked up another award. Clearview picked up the Most Innovative Transport Project award at the UK’s recent National Transport Awards held in London. Clearview Intelligence set up its lighted road stud project in conjunction with Scottish government agency Transport Scotland, road operator BEAR (Scotland), the Transport Research Institute at Edinburgh Napier University and con
  • SolarRoad units installed in cycle path in Estampes
    February 8, 2018
    French road building contractor Charier has introduced the SolarRoad kit (SRK) on a newly laid cycle path in Etampes, France. Two SRK units convert sunlight to electricity and provide lighting for a roundabout near Etampes, a small commune of around 26,000 people about 50km south-west of Paris. The installation helps Charier meet sustainability objectives within the framework of the Paris Agreement. An SRK has four elements of 2.5m x 3.5m and delivers around 3,500kWh per year, which according to Solar R
  • Skanska and Kraton boost RAP use with called SYLVAROAD™ RP1000
    November 23, 2017
    The city of Västerås in central Sweden is known as a centre for industrial automation and information technology. Innovation abounds here and with it comes strong environmental efforts – meeting carbon reduction goals and maximising the recycling process, for example. A road construction project just outside this picturesque city highlights such innovation.