Skip to main content

Elonroad’s electric road and recharging lane for buses in Lund

Sweden’s Transport Administration (Trafikverket) has awarded a contract to the Elväg Syd consortium for an electric and recharging bus lane in the city of Lund. The demonstration area will be built in the bus lane along 1km of Getingevägen Road near central Lund. Construction will begin during the first quarter of 2020 and last for three years. The project’s budget is €9.3 million of which Trafikverket will contribute €8.3 million with the other consortium players supplying the remaining funds. Lun
April 17, 2019 Read time: 3 mins

Sweden’s Transport Administration (1096 Trafikverket) has awarded a contract to the Elväg Syd consortium for an electric and recharging bus lane in the city of Lund.

The demonstration area will be built in the bus lane along 1km of Getingevägen Road near central Lund. Construction will begin during the first quarter of 2020 and last for three years.

The project’s budget is €9.3 million of which Trafikverket will contribute €8.3 million with the other consortium players supplying the remaining funds.

Lund is a historic town of around 91,000 people with cobbled streets and home to Lund University, one of Sweden’s oldest educational institutes. The city also has one of Europe’s most developed cycling infrastructure. There are 4,800 bike parking spaces in the town, including a multi-storey facility at the railway station, more than 260km of bicycle paths and lanes. The government estimates that around 43% of journeys within the city are by bicycle.

The Elväg Syd consortium, which includes state, educational and private sector players, will use technology developed by one of the consortium members, Elonroad. Other members are Innovation Skåne coming on board as project manager, Kraftringen Energi, Lund municipality, Lund University of Technology, Skånetrafiken, Solaris Sverige and Sweden’s National Road and Transport Research Institute (7264 VTI).

The test road is based on a 200m long test track set up outside Lund in 2017 (see video). Elonroad’s concept involves a conductive rail - 5cm high and 30cm wide - laid on top of the asphalt or concrete road surface. The rail acts as a recharging infrastructure for electric vehicles with electric motors and batteries – although the Lund test site will be for only buses. The rail also has inclined sides to make it smooth for vehicles when drivers change lanes.

The rail consisting of short grounded segments are arranged along a single track. Every second segment can switch to positive when a car passes over it. Three contactors will supply a steady current rectified with diodes before charging the battery.

Rainwater passes under the road. During winter, snow can be removed by a special plow developed by Elonroad. Ice on the top surface of the rail will be melted by a heating system. A grounded strip will stop leaking current from the positive segment under the vehicle.

When the driver exits the rail system, the vehicle’s batteries take over for non-electric roads. Batteries take over automatically at exits and roundabouts.

For more information on companies in this article

Related Content

  • Free flow tolling technology is booming
    April 10, 2013
    Jon Masters reports on the latest moves in the free-flow tolling segment. Free-flow tolling of roads and discrete infrastructure, such as bridges and tunnels, is an area of transportation that appears to be booming. Tolling in general is on the up, often still as a means for funding road projects where public sector budgets can no longer cover the necessary costs, but not exclusively so. Several high profile examples of road user charging for ‘demand management’ – the reduction of congestion as part of a wi
  • Oregon’s electric vehicles cruise the West Coast Electric Highway
    December 3, 2014
    Many US states offer cash-back deals and tax breaks to encourage people to buy more electric vehicles. But Oregon has shunned financial incentives and opted to drive up EV sales through increasing the number of recharging stations.
  • All aboard the Wirtgen paving train on Germany’s A7 project
    February 21, 2019
    The A7 is being widened between Hamburg and Bordesholm from four lanes to six - in some places to eight - to ensure the motorway remains an efficient traffic artery. The aim is to create a pavement with a high degree of driving comfort but which withstands the loads of heavy-goods traffic. For widening the 60km stretch in the Schleswig-Holstein region, consortium Via Solutions Nord and joint venture ARGE A7 Hamburg-Bordesholm opted for steel reinforced concrete paving with an exposed aggregate concrete s
  • EastLink demonstrates hands-free driving in Melbourne
    April 10, 2018
    A motorway operator in Australia’s Victoria state has televised a live demonstration of automated driving along a section of one of its roads. The demonstration was along a route of the EastLink, an electronically tolled section of the M3 freeway through the eastern and south-eastern suburbs of Melbourne. EastLink is part of Melbourne's Metropolitan Ring Road project. ConnectEast is an Australian company responsible for the finance, design, construction and operation of EastLink which cost nearly US$2 bi