Skip to main content

Electrical tender launched for Fehmarn tunnel

The winner must set up a renewable energy centre for its work.
By David Arminas February 10, 2021 Read time: 2 mins
Installation will include power for an electrified railway that will run between beside the two the traffic lanes (image courtesy Femern A/S)

A tender has been launched for electrical installation within the planned €7 billion, 18km Fehmarnbelt immersed road-rail tunnel between Germany and Denmark.

As part of what will be a contract worth around €750 million (US$913 million), the winner must set up a renewable energy centre for its work. The tender will close and a decision made by the end of the year, work to start in 2022 or 2023.

Installation will include power for an electrified railway  that will run between beside the two the traffic lanes, ventilation, lighting, safety-emergency-monitoring systems, emergency doors, fire extinguishing systems, drainage, cable-pipe and various control systems.

The Fehmarn Belt is a strait between the German island of Fehmarn and the Danish island of Lolland. The tunnel will replace a ferry service from Rødby and Puttgarden. The project’s approval process was bogged down over environmental issues, especially within the German state of Schleswig-Holstein in which the southern end of 18km immersed tunnel will surface

Meanwhile, Femern Link Contractors started dredging and filling work last month for a works harbour in Rødbyhavn, as well as a tunnel portal on Lolland. A video of the dredging and earthworks is available here.

A Rambøll-Arup-TEC consultancy joint venture is engaged in a client consultancy services contract with Femern. The joint venture has also worked on other landmark infrastructure projects, including the Øresund Tunnel in Denmark, the City Tunnel in Malmö, Sweden, the Medway Tunnel in England, as well as underground rail systems in Amsterdam and Copenhagen.

COWI is carrying out the detailed design of the tunnel (north tunnel section, south tunnel section, and ramps & portals). Meanwhile, SWECO is handling the design for the dredging and reclamation work.

For more information on companies in this article

Related Content

  • Fehmarn Belt tunnel work to start in January
    April 29, 2020
    Construction of the large-scale tunnel element factory at Rødbyhavn can now start soon.
  • EU launches investigation into Fehmarn Belt financing model
    June 21, 2019
    The European Commission said it will investigate the public financing for the Fehmarn Belt link to see if it in line with state aid rules. The announcement follows the European Union General Court's annulment of a previous Commission decision approving the support. "Today's opening of such an investigation is an invitation for all stakeholders to provide their input, which will allow the Commission to adopt a new, well-informed final decision,” said Margrethe Vestager, EU Competition Commissioner.
  • VIDEO: Companies pre-qualify for Fehmarnbelt Fixed Link consulting
    November 3, 2016
    4782 Femern, the company charged with building what will be the world’s longest submerged tunnel, has prequalified companies for consulting work.

    The companies will be able to tender for two framework agreements, one for client consulting services and the other for technical in-house consulting services.

    Femern is responsible for building the 18km Fehmarnbelt Fixed Link immersed tunnel between Rødbyhavn in Denmark and Puttgarden in Germany. The estimated cost has increased over the past several years to reach around €7.4 billion.
  • Contracts are about to be signed for the Fehmarnbelt Fixed Link
    March 13, 2015
    Nearly eight years after Denmark and Germany agreed to construct a major undersea road and rail tunnel, the first contracts are about to be signed. David Arminas reports. Construction is due to start later this year on one of Europe’s most ambitious, as well as the world’s longest, road and rail tunnels, the 17.6km Fehmarnbelt Fixed Link between Germany and Denmark. Fehmarnbelt is expected to cost around US$7.5 billion and be five times the length of the Øresund tunnel between the Danish capital Copenhagen