Skip to main content

Electrical tender launched for Fehmarn tunnel

The winner must set up a renewable energy centre for its work.
By David Arminas February 10, 2021 Read time: 2 mins
Installation will include power for an electrified railway that will run between beside the two the traffic lanes (image courtesy Femern A/S)

A tender has been launched for electrical installation within the planned €7 billion, 18km Fehmarnbelt immersed road-rail tunnel between Germany and Denmark.

As part of what will be a contract worth around €750 million (US$913 million), the winner must set up a renewable energy centre for its work. The tender will close and a decision made by the end of the year, work to start in 2022 or 2023.

Installation will include power for an electrified railway  that will run between beside the two the traffic lanes, ventilation, lighting, safety-emergency-monitoring systems, emergency doors, fire extinguishing systems, drainage, cable-pipe and various control systems.

The Fehmarn Belt is a strait between the German island of Fehmarn and the Danish island of Lolland. The tunnel will replace a ferry service from Rødby and Puttgarden. The project’s approval process was bogged down over environmental issues, especially within the German state of Schleswig-Holstein in which the southern end of 18km immersed tunnel will surface

Meanwhile, Femern Link Contractors started dredging and filling work last month for a works harbour in Rødbyhavn, as well as a tunnel portal on Lolland. A video of the dredging and earthworks is available here.

A Rambøll-Arup-TEC consultancy joint venture is engaged in a client consultancy services contract with Femern. The joint venture has also worked on other landmark infrastructure projects, including the Øresund Tunnel in Denmark, the City Tunnel in Malmö, Sweden, the Medway Tunnel in England, as well as underground rail systems in Amsterdam and Copenhagen.

COWI is carrying out the detailed design of the tunnel (north tunnel section, south tunnel section, and ramps & portals). Meanwhile, SWECO is handling the design for the dredging and reclamation work.

For more information on companies in this article

Related Content

  • Øresund Bridge invests in storm protection
    March 8, 2022
    Danish consortium Øresundsbro Konsortiet will install walls and ramparts near tunnel openings.
  • Denmark: construction of Storstrøm Bridge officially gets underway
    September 27, 2018
    Denmark’s Minister of Transport Ole Birk Olesen has turned the sod to officially start construction of the new 4km road and rail Storstrøm Bridge. The €549 million bridge is scheduled to open for road traffic in 2022 and for rail traffic in 2023. The project budget includes the cost for demolition of the existing bridge that opened in 1937. The 24m-wide single-support cable-stayed structure will connect the islands of Zealand to Falster and touch down on the smaller Masnedø Island.
  • Denmark fixed link project proposed
    March 18, 2022
    A new fixed link project is proposed to span Denmark’s Kattegat strait.
  • Denmark-Sweden’s proposed link
    July 3, 2012
    A proposal for a new bridge from Sweden to Denmark is included in the Swedish government's new infrastructure development plan for the country. The Swedish politicians would prefer a fixed link and they have invited the Danish government to examine the prospects for bridge plans. The Swedish suggestion is for a bridge link across the Sound (Øresund) between Helsingør in Denmark and Helsingborg in Sweden and Danish officials have been invited to comment. This proposal forms part of Sweden’s new infrastructur