Skip to main content

Electrical tender launched for Fehmarn tunnel

The winner must set up a renewable energy centre for its work.
By David Arminas February 10, 2021 Read time: 2 mins
Installation will include power for an electrified railway that will run between beside the two the traffic lanes (image courtesy Femern A/S)

A tender has been launched for electrical installation within the planned €7 billion, 18km Fehmarnbelt immersed road-rail tunnel between Germany and Denmark.

As part of what will be a contract worth around €750 million (US$913 million), the winner must set up a renewable energy centre for its work. The tender will close and a decision made by the end of the year, work to start in 2022 or 2023.

Installation will include power for an electrified railway  that will run between beside the two the traffic lanes, ventilation, lighting, safety-emergency-monitoring systems, emergency doors, fire extinguishing systems, drainage, cable-pipe and various control systems.

The Fehmarn Belt is a strait between the German island of Fehmarn and the Danish island of Lolland. The tunnel will replace a ferry service from Rødby and Puttgarden. The project’s approval process was bogged down over environmental issues, especially within the German state of Schleswig-Holstein in which the southern end of 18km immersed tunnel will surface

Meanwhile, Femern Link Contractors started dredging and filling work last month for a works harbour in Rødbyhavn, as well as a tunnel portal on Lolland. A video of the dredging and earthworks is available here.

A Rambøll-Arup-TEC consultancy joint venture is engaged in a client consultancy services contract with Femern. The joint venture has also worked on other landmark infrastructure projects, including the Øresund Tunnel in Denmark, the City Tunnel in Malmö, Sweden, the Medway Tunnel in England, as well as underground rail systems in Amsterdam and Copenhagen.

COWI is carrying out the detailed design of the tunnel (north tunnel section, south tunnel section, and ramps & portals). Meanwhile, SWECO is handling the design for the dredging and reclamation work.

For more information on companies in this article

Related Content

  • Immersed tube Fehmarnbelt Tunnel approved
    February 21, 2012
    The Danish government has given its approval for the construction of the 18km immersed tube Fehmarnbelt Tunnel, which will connect the country with Germany.
  • BESIX-MTH awards Nordhavn work to Bravida
    February 5, 2024
    Bravida Denmark, on behalf of the BESIX-MTH joint venture, will install plumbing, electricity, ventilation, road lighting and light signals for Copenhagen’s Nordhavn Tunnel.
  • Challenges mount for the Fehmarn Belt Fixed Link project
    December 15, 2016
    The Fehmarn Belt Fixed Link between Danish and German islands faces ongoing delays that are pushing a construction start past this year and well into 2018. A meeting in mid-December between Danish traffic minister Ole Birk Olesen and his German counterpart Reinhard Meyer for the neighbouring German state of Schleswig-Holstein, highlighted mounting opposition against the €7 billion or more project. During the meeting, Meyer stressed that the Schleswig-Holstein government remains determined to implement
  • Tunnel technology improves driving safety
    February 14, 2012
    Tunnel technology advances will make driving through underground links considerably safer, writes Mike Woof