Skip to main content

Dufferin wins Bradford Bypass work in Canada

The 16km four-lane highway - also known as the Highway 400–404 Link - will connect freeways Highway 400 and Highway 404 in Ontario.
By David Arminas August 6, 2024 Read time: 1 min
Let the work begin (image © Gregory21/Dreamstime)

Dufferin Construction has won a US$66.1 million contract for construction of a portion of controlled-access Bradford Bypass freeway in the Canadian province of Ontario.

The 16km four-lane highway - also known as the Highway 400–404 Link - will connect freeways Highway 400 and Highway 404 through the towns of Bradford and East Gwillimbury.

Dufferin’s work includes the construction of a southbound lane on Highway 400 that will merge with the yet-to-built Bradford Bypass, the expansion of Simcoe County Road 88 from two lanes to four, renovation of Highway 400-Simcoe County Road 88 interchange and an underpass bridge.

Dufferin recently started work and will also complete basic works for future expansion of Highway 400 platform to 10 lanes.

The Ontario government recently awarded the US$11.6 million contract to AECOM for detailed design of the 6.5km west section of the Bradford Bypass from Highway 400 to Simcoe County Road 4.

For more information on companies in this article

Related Content

  • India highway works planned
    July 28, 2020
    Key highway works are being planned in India.
  • Stockholm’s new bypass
    March 8, 2021
    Tunnels make up 18km of the 21km of the Swedish capital’s E4 Bypass mega-project. It will have taken 15 years from start to opening in 2030, if all goes well
  • More tenders for the Lower Thames Crossing
    April 2, 2021
    The winners will build 23km of road connecting to what will be the UK’s longest road tunnel.
  • G&Z paving Canada’s longest runway
    October 12, 2012
    A contractor in Canada, Dufferin Construction, is using three items of new equipment bought from Guntert & Zimmerman to pave the country’s longest runway. The project is extensive, featuring a new runway measuring 4.3km long by 60m wide, an apron area measuring 145,000m2 and two taxiways, each 3.8km long by 25m wide. In all, the work requires 1.5 million tonnes of base aggregate, and 200,000m2 of cement-stabilised base. Dufferin Construction Company, a division of Holcim (Canada) already owns two other G&Z