Skip to main content

Doka wins Fehmarnbelt Tunnel formwork deal

When completed in 2029, the Fehmarnbelt Tunnel between Denmark and Germany will accommodate a four-lane highway, as well as a two-track electrified rail line.
By David Arminas November 17, 2022 Read time: 2 mins
Doka has picked up the scaffolding, formwork and associated services contract for Northern Europe's largest infrastructure project, the immersed Fehmarnbelt Tunnel now under construction between Denmark and Germany (© Femern A/S)

Doka will provide its comprehensive formwork expertise on the Fehmarnbelt Tunnel project, which will be the world's largest immersed tunnel for road and rail traffic.

The Fehmarnbelt Fixed Link is an important element in the green transition for the European transport sector. The link will be an 18km immersed tunnel between Rødbyhavn on Lolland island  in Denmark and Puttgarden on Fehmarn island in Germany. It will essential be another link connecting Scandinavia with the rest of Europe. When complete in 2029, the tunnel will be the world’s longest immersed tunnel for cars and trains.

Sustainability is positioned at the heart of the project. “It is determining the way the tunnel is constructed and will be the framework for operations when the tunnel is finished,” said Robert Hauser, chief executive of Doka. “This approach works only if you have partners who share the same mindset. We are very pleased to be able to apply our expertise as a global leader in formwork construction for such a significant infrastructure project in the European transport network."

Construction work for the tunnel is taking place on land and at sea. Doka will be responsible for the construction of the tunnel entrances and ramps on both the Danish and German sides. The scope of work includes, among others, the construction of cut-and-cover parts of the tunnel, the buildings at the entrances and exits and the ramps, as well as light attenuation of the tunnel, various structures and landside civil work.

The completed Fehmarnbelt Tunnel will accommodate a four-lane highway, as well as a two-track electrified rail line. In addition to a direct road connection between Scandinavia and Central Europe the tunnel will create a green transport corridor with a fully electrified railway to encourage the shift of freight traffic from road to rail. The tunnel will also help lower carbon emissions by reducing fuel consumption as the distance between Hamburg and Copenhagen will be cut by 160km.

This will also amount to a driving-time saving of around two hours. Respect for nature and the environment is a top priority in the construction and subsequent operation of the Fehmarnbelt Tunnel. Doka uses methods and materials that have a positive impact on the environment in all its projects. Doka said that it is the first company to introduce “authentic and transparent emissions data for its portfolio of 6,000 products”.

Doka, based in Austria, has more than 160 sales and logistics facilities in over 60 countries, employing 6,800 people worldwide. It is part of the Umdasch Group, also based in Austria.

For more information on companies in this article

Related Content

  • Ferry operators sink the financing plan for Fehmarn Belt link
    December 17, 2018
    The Court of Justice of the European Union has said Denmark’s state grant aid to the proposed Fehmarn Belt link is illegal under EU rules. The court noted that the European Commission approved the Fehmarn project’s financing – total cost likely around the €8.7 billion - in July 2015 without a formal procedure. Denmark is completely responsible for financing the project that will replace a ferry service. Part of the funds were to come through the European Union and its Connecting Europe Facility for tr
  • Costs revised for Denmark’s proposed Kattegat Bridge
    May 9, 2016
    A proposed bridge across the Kattegat Sea in northern Europe would be cheaper for the Danish government than previously expected, according to an engineering report. The bridge between Denmark’s Jutland and Zealand islands would need around €2.02 billion in government subsidies, noted the report from Danish engineering consultancy Rambøll. A previous report from the Ministry of Transport concluded that subsidies would have to be around €6.85 billion and need to be financed by loans. This caused the mi
  • Denmark fixed link project proposed
    March 18, 2022
    A new fixed link project is proposed to span Denmark’s Kattegat strait.
  • Denmark set to appoint preferred bidder for Fehmarnbelt link
    March 14, 2016
    The Danish political parties behind the Fehmarnbelt link have mandated Femern A/S to appoint preferred bidders for the main tunnel work in order to enter into conditional contracts no later than mid-May. Femern A/S is the Danish government-owned company managing the Fehmarn Belt immersed tunnel project between Denmark and Germany. The project was approved by the Danish parliament in April last year. It is supposed to be built, owned - apart from the German land works - and operated by Femern A/S, a su