Skip to main content

Denmark reconsiders a Kattegat link

A bridge would cross the Kattegat Strait between the Jutland peninsula city of Aarhus - Denmark’s second largest city after the capital Copenhagen - and Kalundborg, a small city of 17,000 on the western shore of Zealand Island.
By David Arminas May 10, 2023 Read time: 3 mins
A proposed Kattegat Link would make redundant fast ferries to and from the small island of Samsø – a landing point for a combined road and rail bridge connecting the Jutland peninsula and the island of Zealand (image © Ricochet69/Dreamstime)

The Danish government is again considering the feasability of a Kattegat link that would connect the country’s main Jutland peninsula with the Island of Zealand.

Such a combined road and rail bridge would cross the 35km Kattegat Strait between the Jutland city of Aarhus, with a population of around 540,000 – Denmark’s second largest city after the capital Copenhagen - and Kalundborg, a small city of 17,000 on the western shore of Zealand.

The economic driver for such a link is that it would create a direct route between Copenhagen on Zealand’s eastern coast to Aarhus, running westerly across Zealand to Kalundborg. From there it would be a bridge what would be constructed via Samsø , a small  island in the Kattegat Sea. In effect, there would be two section of the link - Kalundborg to Samsø and Samsø to Aarhus.

According to a recent report in the Danish newspaper Dagbladet Licitationen the estimated cost of the project is around €14.68 billion (US$16.24 billion).

In 2014, the transport ministry estimated that traffic volumes between Zealand and Jutland would not be enough to warrant a Kattegat Bridge – costing around €11.8 billion - until about 2050.

Thomas Danielsen, Denmark’s minister of transport, recently said that before any announcement about the feasability of such a project is made, there would have to be cross-party support in the Danish Parliament for building the link. The issue is part of a transportation debate in the country’s parliament this week

The previous government announced last summer that there a link’s environmental impact could mean that it would never be built.

In March 2020, COWI submitted studies for a combined road and rail connection across Kattegat, applying different corridors from central Zealand to Aarhus via Samsø. According to COWI, further work has assessed road and rail infrastructure in Jutland and on Zealand as well as studying technical solutions between the coasts of Zealand and Jutland including corridors via Sjællands Odde.

“The purpose is to weigh up the pros and cons of the different corridors,” says a note on the company’s website, “and to prepare a solid basis for further political discussion about the next steps, including whether to proceed with an environmental impact assessment for the Kattegat project.”

The project involving onshore infrastructure is carried out for the Danish Road Directorate along with the Danish Transport, Construction and Housing Authority. The study on the offshore technical solutions is carried out for Sund & Bælt. For the project, COWI has been working with the architectural firms Dissing+Weitling and Hasløv & Kjærsgaard as subconsultants.

Successive governments over the past two decades have considered a Kattegat Bridge that would supplement the 18km Great Belt Fixed Link  – Storebæltsbroen. It crosses the Great Belt strait between Zealand and Funen – Denmark’s third largest island and close to the southeastern end of the Jutland peninsula as it joins mainland Europe at a border with Germany. Great Belt Fixed Link consists of a road suspension bridge, a railway tunnel between Zealand and the small island Sprogø in the middle of the Great Belt and a box-girder bridge for both road and rail traffic between Sprogø and Funen.

Denmark is currently constructing one of Europe’s largest transportation infrastructure projects, the immersed Fehmarn Belt road and rail tunnel between Denmark and Germany. It will run18km tunnel under the Baltic Sea, between the Danish island of Lolland and the German island of Fehmarn.

For more information on companies in this article

Related Content

  • Trevi Group posting strong results
    July 5, 2022
    Orders acquired by the Group in the first five months of 2022 amounted to €342.8 million.
  • Land bridge mega project proposed
    October 2, 2023
    A land bridge mega project is being proposed.
  • Machinery moves on site for New Zealand’s Kapiti Coast expressway
    July 11, 2017
    Onsite work has started in the Kapiti Coast region on the Otaki-Peka Peka Expressway, part of the greater Wellington Northern Corridor project. Simon Bridges, New Zealand’s transport minister, recently turned the first sod on the US$175 million project. Travel times should be improved between Port of Wellington, hospitals, Wellington’s central business district and ferry terminals. The 110km Wellington Northern Corridor largely follows the current state highway route from the airport to Linden, near Tawa. F
  • NCC picks up Eysturoy and Sandoy tunnel contracts in the Faroes
    November 15, 2016
    Swedish construction company NCC has signed a contract to build two sub-sea road tunnels in the Faroe Islands, an archipelago north of Scotland. The first project – the Eysturoy Tunnel between Eysturoy and Streymoy - will cost around €152 million. The value of second one – the Sandoy Tunnel between Streymoy and Sandoy – will cost about €120 million, but there is an option for the government-owned client, P/F Eystur- och Sandoyartunlar (EST), not to proceed. The government created the company, Eystur – og