Skip to main content

Delcan wins freeway safety patrol project

In collaboration with Systems Metric Group, Delcan has been awarded a contract to develop and implement a regional freeway service patrol (FSP) programme for the Los Angeles Metropolitan Transportation Authority (MTA).
April 30, 2012 Read time: 1 min
In collaboration with Systems Metric Group, 2698 Delcan has been awarded a contract to develop and implement a regional freeway service patrol (1604 FSP) programme for the Los Angeles Metropolitan Transportation Authority (5363 MTA).

The company is tasked with developing comprehensive and detailed documents necessary to implement, operate and manage MTA’s 156 vehicle FSP programme, the largest in the US, as it transitions 39 beats into six regions. Top priorities for this project include improvement to contract and management operations, revisions to the violation and penalty structure and reviewing the program for Quick Clearance policies.

When asked why Delcan’s Emergency Transportation Operations (ETO) Division was selected, the Project Steering Committee, which includes representatives from the 5364 California Highway Patrol, MTA and 5246 Caltrans, all agreed that Delcan’s team is the only consulting team out there with “experienced, hands-on operations experts” to move a programme this size into the next generation, a regionalised approach. Delcan’s ETO team is staffed with nationally recognised law enforcement, FSP, EMT, Fire, 3278 ITS transportation and engineering experts.

For more information on companies in this article

Related Content

  • IRF Geneva highlights making roads safe: a priority for all
    May 15, 2014
    IRF Geneva’s Susanna Zammataro highlights the importance of the Federation’s ongoing commitment to the work of the United Nations Road Safety Collaboration, with which she serves as co-chair of the project group dedicated to Safer Roads and Mobility On 10th April, the United Nations General Assembly was due to discuss a new global road safety resolution. For those who might dismiss this as just another piece of paper condemned to sit on government shelves and gather dust, this a reminder of a few facts
  • Right ways to deter wrong-way
    November 11, 2020
    After a pilot programme, California’s Caltrans is reviewing its highway design standards
  • IRF’s Marrakech regional event focuses on North Africa
    April 12, 2013
    A series of dynamic meetings in Marrakech signal the forward direction of IRF Geneva as it gears up for a bright new era as a global voice of the road sector. As these pages go to press, IRF Geneva is just emerging from a very rewarding regional conference focusing on North Africa and the Mediterranean that took place from 19-20 March, 2013. The success of this high-level gathering, organised in association with the Moroccan Road Association and Moroccan Motorways (Autoroutes du Maroc), reflects IRF Geneva’
  • East End Crossing Project—Availability payment P3 in action
    July 14, 2017
    Indiana exercised its authority to use a P3 contract when it partnered with Kentucky for new bridges across the Ohio River. Barney Allison and John Smolen* explain the groundbreaking availability payment deal. Earlier this year, traffic began rolling over the new tolled Lewis and Clark Bridge spanning the Ohio River from northern Kentucky to southern Indiana. The cable-stayed bridge is part of the award-winning Ohio Bridges Project to untangle traffic within the greater metropolitan area of Louisville, Kent