Skip to main content

Danish SolarFuture builds solar facility by Öresund Bridge

Solar cell panels worth around €270,000 will produce energy for the Øresund Bridge that connects Denmark and Sweden. Danish companies SolarFuture and Solarpark DK have been awarded the contract to install 1,500m² solar panels near the toll station of the Øresund Bridge. The three-year agreement is with Øresundsbro Konsortiet - the Danish-Swedish company that owns and operates the Øresund Bridge. The panel will generate around 4% of the power to operate the bridge, including deck lighting and
January 10, 2018 Read time: 2 mins

Solar cell panels worth around €270,000 will produce energy for the Øresund Bridge that connects Denmark and Sweden.

Danish companies SolarFuture and Solarpark DK have been awarded the contract to install 1,500m² solar panels near the toll station of the Øresund Bridge.

The three-year agreement is with Øresundsbro Konsortiet - the Danish-Swedish company that owns and operates the Øresund Bridge.

The panel will generate around 4% of the power to operate the bridge, including deck lighting and building interior lighting at an estimated annual saving of close to €27,000. There will also be an estimated CO2 reduction of 85tonnes.

Eventually, solar power could supply around 10% of energy with solar power, said Bengt Hergart, property director at Øresundsbro Konsortiet.

Solar panels will be placed between the northern and southern side of the toll station and at least 3m from the traffic lane, behind the railing and light columns - close to both the motorway and the railway.

The Øresund, which opened in 2000, is a road-rail bridge-tunnel structure running across and under the Øresund strait from the Danish capital Copenhagen to Malmö in Sweden. The road and rail runs along an 8km cable-stayed bridge to an artificial island where it then enters a 4km-long tunnel.

The cable-stayed bridge features two 204m-high pylons supporting the 490m-long bridge span across the Flinte Channel. The motorway runs on the upper level while the railway runs underneath.

Most bridge structures including the piers and spans were built on land and towed into position on barges. Only the pylons were cast in situ. The Øresund is operated by both countries and was designed by Danish engineering firm COWI along with main architect George KS Rotne.

Related Content

  • Lighting innovations boosting brightness, cutting costs
    January 27, 2014
    CU Phosco’s new P850 LED main road lantern has just seen its first major deployment – between Junctions 16 and 17 of the A55, a strategic road which skirts the North Wales coastline – Jason Barnes reports The A55 is a grade-separated dual carriageway also known as the North Wales Expressway. Some 139km long, it originally ran from Chester to Bangor but was extended across the Isle of Anglesey into Holyhead Docks in 2001 under a project part-funded by the European Union.
  • New Tanzanian bridge project moving ahead
    August 2, 2019
    Tanzania’s planned Kigongo-Busisi Bridge will span part of Lake Victoria and improve transport connections for the country’s Mwanza Region.
  • India pushing ahead with infrastructure projects
    July 4, 2012
    Despite the economic downturn, India looks to be pressing ahead with its major infrastructure projects to further boost its incredible growth. Patrick Smith reports India, which like most countries has been affected by the current economic climate, although not to the same extent, is pressing ahead with its ambitious highway construction plans. Each week new projects are completed, started or awarded as the nation seeks to improve its transportation requirements. These are needed to meet the aspirations of
  • Edeva makes Actibump available globally
    August 4, 2022
    Edeva, the Swedish manufacturer of Actibump, have, after 10 years and 100 installations in the Nordics and Australia, has made the system available worldwide.