Skip to main content

Czech tenders for D6 section near Karlovy Vary

The Petrohrad-Lubenec section includes several bridges with work starting by the end of the year for completion in 2026.
By David Arminas June 7, 2023 Read time: 2 mins
The spa city of Karlovy Vary, with around 50,000 inhabitants, is along the D6 motorway (image © Ronstik/Dreamstime)

The Czech Republic has tendered for construction of a 12km section of the D6 motorway in Karlovy Vary worth around €208.63 million.

Karlovy Vary, with around 50,000 inhabitants, is about 106km west of the capital city Prague. It lies at the confluence of the Ohře with the Teplá and Rolava rivers. The national road and motorway directorate RSD that the Petrohrad-Lubenec section includes several bridges with work starting by the end of the year for completion in 2026.

The D6, when completed, will go from Prague through Karlovy Vary and Cheb to the border with Germany. Its first segment was opened in 1980s.

Meanwhile, the government will start looking for a concessionaire for the D35 motorway project in the third quarter of this year when the qualification round for the project will be announced. The two longest missing sections of the motorway will be financed and built by the private sector as part of the public-private project. Cost of the PPP project is expected to come in at around €1.35 billion. Work is due to be completed in 2027.

Last month it was reported that a year after the start of construction, the Czech Republic’s first and only road public-private partnership is on schedule for opening in early 2025. Since 2021, VINCI Highways has led ViA SALis, the consortium for constructing and operating the 32km-long D4 Via Salis. The motorway will link Příbram in central Bohemia to Písek, southern Bohemia. ViA SALis is a 50/50 venture between VINCI and Meridiam.

 

Related Content

  • Germany builds its first major PPI autobahn project
    July 7, 2015
    Rebuilding of one of the oldest motorways in Germany is testing out the possibilities for public-private project road construction reports Adrian Greeman A freshly renovated section of the A8 Autobahn in southern Germany will be watched with some interest this summer as traffic begins driving along its rebuilt carriageway and additional third lanes. That is not because of any special road features, other than a distinctive reddish colour to its concrete surface, but because it is a first fullscale public
  • Increased costs for new Duisburg bridge
    June 2, 2020
    Increased costs are now being anticipated for the new Duisburg bridge project.
  • Private consortium to finance Melbourne's Peninsula Link highway
    July 13, 2012
    Not long after the recent completion of the successful EastLink project (a 39km motorway providing a vital connection for 1.5 million people in Melbourne, Australia) the Victorian Government has started work on another missing link in Melbourne's freeway network further south with the construction of Peninsula Link. Peninsula Link is a key project in the Victorian Government's AUD$38 billion (US$32 billion) Victorian Transport Plan. With a AUD$750 million (US$630 million) price tag, the project is expected
  • RFQ is out for the Gordie Howe Bridge to link US and Canada
    July 22, 2015
    The bidding process has started for the Gordie Howe International Bridge that will link Detroit in the US state of Michigan and Windsor, in the Canadian province of Ontario. The Windsor-Detroit Bridge Authority (WDBA) has sent out a request for qualifications (RFQ) for the bridge that will likely be either cable stayed or suspension to cross the Detroit River. The bridge also likely will come with a hefty price tag – around US$1.62 billion, as World Highways reported in May in a feature on the proposed b