Skip to main content

Czech republic starts planning for winter maintenance

The Czech republic’s Transport Ministry said spend close to €310 million for maintenance and winter gritting of class I roads. Winners of the tenders for 14 regional authorities should start their eight-year road maintenance contracts on 1 May 2017, according to media reports.
August 1, 2016 Read time: 1 min
The Czech republic’s Transport Ministry said spend close to €310 million for maintenance and winter gritting of class I roads.

Winners of the tenders for 14 regional authorities should start their eight-year road maintenance contracts on 1 May 2017, according to media reports.

Related Content

  • Warm mix use in the US and Czech Republic is strong
    May 20, 2014
    The Czech Republic has seen its first ever use of warm mix produced using additive Evotherm - and a survey carried out in the US shows that warm mix is still on the rise there - Kristina Smith reports The troubled Blanka Tunnel in Prague will see the Czech Republic’s first ever use of Evotherm warm mix asphalt (WMA) technology. The 6km tunnel is the longest urban motorway tunnel in Europe and will take the north-west section of the city ring road below ground. Designed as dual carriageway throughout w
  • Czech roads get quality assurance
    June 25, 2012
    In the Czech Republic the road authorities are looking to address quality issues that have caused problems on the country’s roads and highways. The Czech Roads and Motorways Directorate (RSD) plans to check the quality of highways using vehicle-mounted scanning laser technology. This will allow RSD to launch repairs before potholes are formed.
  • Czech Republic highway deal for consortium
    October 8, 2020
    A highway deal in the Czech Republic will be handled by a consortium.
  • Construction of Slovakia’s D3 stretch to start by end of 2016
    November 28, 2016
    Construction of the 5.6km stretch of the D3 motorway Cadca, Bukov - Svrcinovec in Slovakia could start by the end of the year. The tender was rolled out in May 2015 by the Slovak national motorway operator NDS and the final contract was recently signed for the €239million deal. Winners are the consortium of Hochtief from Germany and Austrian firms Strabag and PORR. Completion is schedule for 2020. Porr’s share of the contract is reportedly around €81 million and Strabag's around €105 million. Work inc