Skip to main content

Czech republic starts planning for winter maintenance

The Czech republic’s Transport Ministry said spend close to €310 million for maintenance and winter gritting of class I roads. Winners of the tenders for 14 regional authorities should start their eight-year road maintenance contracts on 1 May 2017, according to media reports.
August 1, 2016 Read time: 1 min
The Czech republic’s Transport Ministry said spend close to €310 million for maintenance and winter gritting of class I roads.

Winners of the tenders for 14 regional authorities should start their eight-year road maintenance contracts on 1 May 2017, according to media reports.

Related Content

  • D8 highway in Czech Republic delayed
    September 19, 2013
    Completion of the final stretch of the D8 highway in the Czech Republic will be delayed. The 4.7km section of highway in the Czech region of Usti Nad Labem Oldrich Bubenicek will not be built by 2015 as planned originally. A landslide that occurred near Litochovice in June 2013 is the reason for the delay. Additional geotechnical surveys now have to be carried out before work can commence to to repair the damage cause by the landslide. It is possible that the results of the survey work will show that the ro
  • Substantial motorway expansion projects planned in Bavaria
    February 2, 2017
    The budget for Germany’s Motorway Directorate for Northern Bavaria will remain at around €520 million for 2017, according to media reports. For many years the budget for the Autobahndirektion Nordbayern (ADNB) was pegged between €320-380 million. This changed last year when it was boosted to €520 million, noted the newspaper Süddeutsche Zeitung. Substantial work is planned on the A3 and A6 motorways and on bridges. The 94km on the A3 between Aschaffenburg and Würzburg will be widened to six lanes by 2
  • First part of Hradec-Smirice D11 gets planning permission
    June 12, 2017
    The Czech Transport Ministry has issued a planning permission for the first part of the planned D11 motorway construction for the 15.5km long section Hradec Kralove-Smirice which is expected to cost nearly €247 million.
  • Germany plans replacement for A40 Neuenkamp Duisburg Bridge
    March 6, 2018
    Germany’s motorway authority has unveiled plans for an 802m cable stayed replacement bridge taking the A40 over the Rhine River near Duisburg. The state owned authority Deges - Deutsche Einheit Fernstraßenplanungs- und -bau - will oversee the project that includes an eight-lane expansion of the A40, all in the industrial Rhur region.