Skip to main content

Czech Republic: RSD gives go-ahead to road contracts worth €966mn

The Czech road and motorway management company RSD has given permission to construction firms to begin road building projects worth over €966 million (CZK 25 billion). The projects originate from the years 2008 to 2010, when expensive contracts were signed after only two subjects having taken part in tenders. The top three most expensive projects include the R49 road between Hulin and Frystak worth €302.26 million (CZK 7.8 billion), the motorway section D11 Osicky-Hradec Kralove worth €144.15 million (CZ
September 30, 2013 Read time: 1 min
The Czech road and motorway management company RSD has given permission to construction firms to begin road building projects worth over €966 million (CZK 25 billion).

The projects originate from the years 2008 to 2010, when expensive contracts were signed after only two subjects having taken part in tenders. The top three most expensive projects include the R49 road between Hulin and Frystak worth €302.26 million (CZK 7.8 billion), the motorway section D11 Osicky-Hradec Kralove worth €144.15 million (CZK 3.72 billion) and the I11 Ostrava Prodlouzena Rudna road worth €124.39 million (CZK 3.21 billion). RSD managed to negotiate a few percentage price reduction in some cases and hopes that some projects could be included in the Operational Program Transport for EU funding.

Related Content

  • Machine control technology shortens road contract
    May 28, 2013
    The use of sophisticated machine control technology has helped halve the schedule required for a road contract – Jeff Winke. By using the latest machine control systems on the equipment fleet, a US contractor has managed to halve worker hours, machine time and overall costs. “We chopped 50% off the contract schedule,” said Jim Swenson, licensed professional land surveyor for Oregon Mainline Paving based in McMinnville, Oregon. “The project was completed a year ahead of the two-year schedule,” he explained
  • Machine control technology shortens road contract
    May 28, 2013
    The use of sophisticated machine control technology has helped halve the schedule required for a road contract – Jeff Winke. By using the latest machine control systems on the equipment fleet, a US contractor has managed to halve worker hours, machine time and overall costs. “We chopped 50% off the contract schedule,” said Jim Swenson, licensed professional land surveyor for Oregon Mainline Paving based in McMinnville, Oregon. “The project was completed a year ahead of the two-year schedule,” he explained.
  • €944.7 million for Czech highway links
    January 10, 2025
    €944.7 million being spent for for Czech highway links.
  • Ohio's highway investment
    February 9, 2012
    The US State of Ohio is planning an increase in spending on road construction for 2010. The authorities intend to increase spending by 30% over previous years to some US$2 billion.