Skip to main content

Croatia’s Pelješac Bridge to open mid-year

China’s CRBC started construction on the bridge in 2019 amid concerns by European construction companies of price dumping.
By David Arminas February 8, 2022 Read time: 2 mins
The 2.4km-long bridge stands 55m above sea level with pylons up to 124m high (image © Damir Senčar/Dreamstime)

Wind barriers and cabling are among final structural touches to the 2.4km-long Pelješac Bridge that is set to open in June, according to Croatian media.

The four-lane cable-stayed bridge is around 23m wide stands 55m above the waters of the Bay of Mali Ston in the Adriatic Sea. Its pylons rise to 124m. The final steel span of the bridge was one of 165 such sections built for the infrastructure project by the China Rail and Bridge Corporation, CRBC.

Last July, the final section of the last span was installed. The bridge connects Croatia’s mainland at the town of Komarna with the town of Brijesta on the Pelješac peninsula, meaning vehicles will not need to travel through Bosnia and Hercegovina to access the Croatian territory.

Hrvatske Ceste, the state-owned company responsible for Croatia’s public roads, awarded the tender to China Road and Bridge Corporation in 2018 for a reported €420 million. But the Austrian firm Strabag and the consortium of the Italian company Astaldi and Turkey's IC Ictas Isaat Sanayi filed a complaint in Croatian courts against the selection of the CRBC, claiming the Chinese firm’s bid was too low to be sustainable. However, the complaint was turned down by the courts.

China Road and Bridge Corporation is part of the Chinese state-owned China Communications Construction Company. CCCC was formed through the merger of CRBC and China Harbour Engineering in 2005.

It is reportedly the first such project for a Chinese company within the European Union and is part of China’s Belt and Road Initiative to fund and construct major infrastructure between China through Asia to the Middle East, Africa and Europe.

For more information on companies in this article

Related Content

  • Karlsruhe’s Rhine bridge planning to restart
    July 15, 2021
    The proposed road bridge would connect Karlsruhe and Wörth and be built around 1.4km from another Rhine bridge.
  • Višňové Tunnel delays continue
    June 21, 2022
    What will be Slovakia’s longest tunnel at 7.5km is facing more technical issues, according to the contractor Skanska.
  • Fehmarn tunnel cleared for construction
    October 18, 2021
    The 17.6km Fehmarnbelt tunnel will be between Germany and Denmark.
  • Corridor for prosperity: The 5G Road
    June 14, 2019
    The next generation of highways will be a matrix of smart, intelligent and dynamic technologies that lower maintenance costs and ensure user safety. But challenges lie ahead, as Geoff Hadwick discovered in Dubrovnik The fifth-generation road is about to provide the world’s highway authorities with a big leap forward. This “forever-open”, self-healing road will integrate innovation into infrastructure, vehicles and entire intelligent transport systems, says Adewole Adesiyun, deputy secretary general of