Skip to main content

Croatia’s Pelješac Bridge to open mid-year

China’s CRBC started construction on the bridge in 2019 amid concerns by European construction companies of price dumping.
By David Arminas February 8, 2022 Read time: 2 mins
The 2.4km-long bridge stands 55m above sea level with pylons up to 124m high (image © Damir Senčar/Dreamstime)

Wind barriers and cabling are among final structural touches to the 2.4km-long Pelješac Bridge that is set to open in June, according to Croatian media.

The four-lane cable-stayed bridge is around 23m wide stands 55m above the waters of the Bay of Mali Ston in the Adriatic Sea. Its pylons rise to 124m. The final steel span of the bridge was one of 165 such sections built for the infrastructure project by the China Rail and Bridge Corporation, CRBC.

Last July, the final section of the last span was installed. The bridge connects Croatia’s mainland at the town of Komarna with the town of Brijesta on the Pelješac peninsula, meaning vehicles will not need to travel through Bosnia and Hercegovina to access the Croatian territory.

Hrvatske Ceste, the state-owned company responsible for Croatia’s public roads, awarded the tender to China Road and Bridge Corporation in 2018 for a reported €420 million. But the Austrian firm Strabag and the consortium of the Italian company Astaldi and Turkey's IC Ictas Isaat Sanayi filed a complaint in Croatian courts against the selection of the CRBC, claiming the Chinese firm’s bid was too low to be sustainable. However, the complaint was turned down by the courts.

China Road and Bridge Corporation is part of the Chinese state-owned China Communications Construction Company. CCCC was formed through the merger of CRBC and China Harbour Engineering in 2005.

It is reportedly the first such project for a Chinese company within the European Union and is part of China’s Belt and Road Initiative to fund and construct major infrastructure between China through Asia to the Middle East, Africa and Europe.

For more information on companies in this article

Related Content

  • Work starts on Banja Luka-Prijedor highway
    November 18, 2021
    The highway in Republika Srpska is part of the Banja Luka-Novi Grad motorway.
  • Cables up for Romania’s Brăila Bridge
    June 16, 2021
    The Astaldi and IHI Infrastructure Systems joint venture reports that work will soon start on the road deck for Romania’s Brăila Bridge.
  • Ayesa secures contract on Panama Canal bridge project
    November 25, 2019
    Spanish engineering firm Ayesa has been awarded a US$4.7 million contract to be the independent engineer for reviewing construction of the fourth Panama canal bridge.
  • Croatia bridge project underway again
    August 2, 2019
    Construction work is underway once more for Croatia’s Peljesac Bridge project. The 2.4km bridge is being built by Chinese contractor China Road and Bridge Corporation. The structure should be complete in 2021 and is expected to cost €420 million, of which €357 million is being provided by the European Community. When complete, the bridge will connect the Croatian mainland with the Peljesac Peninsula. This will improve transport in the country as it will provide a direct route between Dubrovnik and the rest