Skip to main content

Croatia’s Pelješac Bridge to open mid-year

China’s CRBC started construction on the bridge in 2019 amid concerns by European construction companies of price dumping.
By David Arminas February 8, 2022 Read time: 2 mins
The 2.4km-long bridge stands 55m above sea level with pylons up to 124m high (image © Damir Senčar/Dreamstime)

Wind barriers and cabling are among final structural touches to the 2.4km-long Pelješac Bridge that is set to open in June, according to Croatian media.

The four-lane cable-stayed bridge is around 23m wide stands 55m above the waters of the Bay of Mali Ston in the Adriatic Sea. Its pylons rise to 124m. The final steel span of the bridge was one of 165 such sections built for the infrastructure project by the China Rail and Bridge Corporation, CRBC.

Last July, the final section of the last span was installed. The bridge connects Croatia’s mainland at the town of Komarna with the town of Brijesta on the Pelješac peninsula, meaning vehicles will not need to travel through Bosnia and Hercegovina to access the Croatian territory.

Hrvatske Ceste, the state-owned company responsible for Croatia’s public roads, awarded the tender to China Road and Bridge Corporation in 2018 for a reported €420 million. But the Austrian firm Strabag and the consortium of the Italian company Astaldi and Turkey's IC Ictas Isaat Sanayi filed a complaint in Croatian courts against the selection of the CRBC, claiming the Chinese firm’s bid was too low to be sustainable. However, the complaint was turned down by the courts.

China Road and Bridge Corporation is part of the Chinese state-owned China Communications Construction Company. CCCC was formed through the merger of CRBC and China Harbour Engineering in 2005.

It is reportedly the first such project for a Chinese company within the European Union and is part of China’s Belt and Road Initiative to fund and construct major infrastructure between China through Asia to the Middle East, Africa and Europe.

For more information on companies in this article

Related Content

  • Tender evaluation nears for Croatia’s Peljeski Bridge Project
    September 22, 2017
    Croatia’s roads agency Hrvatske Ceste will soon start evaluating tenders for the controversial Peljeski Bridge project, according to national media. Bids for construction of the four-lane 2.4km long bridge have been submitted by the China Road and Bridge Corporation, Austria's Strabag as well as consortia headed by Italy’s Astaldi and the Turkish company Ictas. The bridge will connect Croatian territory by traversing the Adriatic Sea’s Mali Ston Bay.
  • Croatia: Peljeski Bridge decision in summer 2017
    November 21, 2016
    Croatia’s minister of infrastructure, Oleg Butkovic, said a winner will be chosen to build the controversial Peljeski Bridge on the Adriatic Sea coast by summer 2017. The project, valued at around €370 million, will be carried out in three phases. In June, a tender was started by the national roads company Hrvatske Ceste but was halted last month over complaints by some bidders about pre-qualification issues. The State Commission for Control of Public Ordering recently rejected the pre-qualificatio
  • Seven bids submitted for Croatia’s Peljeski bridge access roads
    June 18, 2018
    Croatia’s construction company Integral Inzinjering has submitted the lowest bid of €43 million for construction of access roads for the Peljeski bridge project. Croatian daily newspaper Vecernji List reported that seven bidsd were submitted for the 12.4km project. Highest bid of €88 million has come from China Road and Bridge Corporation, which has the contract to build the bridge. Austria's Strabag offered €65 million. Other bidders were France's Colas, Croatia's GP Krk in cooperation with the Bosni
  • Croatia rejects complaints over Peljeski Bridge tender
    April 6, 2018
    Croatia’s public procurement body has rejected complaints by all three international consortia over a winning low tender for the Peljeski bridge. Bids for construction of the four-lane 2.4km bridge were submitted in the middle of last year. The bridge will connect Croatian territory by traversing the Adriatic Sea’s Mali Ston Bay. Vehicles must currently head from Croatia into Bosnia to re-enter a peninsula that is Croatian territory. Croatia’s State Commission for Control of Public Ordering Processes