Skip to main content

Costain completes Preston Western Distributor

The Preston Western Distributor Project consists of a new motorway junction - the M55 Junction 2 - a dual carriageway and two connecting link roads in northern England.
By David Arminas July 10, 2023 Read time: 2 mins
Ecology and nature conservation were important considerations for the Preston Western Distributor Project (image courtesy Costain)

Costain has completed a €241 million road scheme linking the northern English city of Preston and the neighbouring Fylde region to the M55 motorway.

The Preston Western Distributor Project consists of a new motorway junction - the M55 Junction 2 - a dual carriageway and two connecting roads. Work was delivered on behalf of Lancashire County Council as part of the Preston, South Ribble and Lancashire City Deal, said Andy Clarke, integrated transport director at Costain.

Ecology and nature conservation were important considerations for the project. The plans were designed to restore farmland and to protect and enhance habitats for species including great crested newts, bats, birds, brown hare, hedgehogs and common toads. The project has delivered a net gain in biodiversity of around 10%, according the Costain, the contractor for the project.

In addition, all the removed soil was kept onsite and reused for landscaping around the new roads. Together with other initiatives such as renewable energy use and eliminating diesel across the project, Costain said it saved more than the equivalent of 6,000 tonnes of carbon dioxide.

The new dual carriageway is named after Edith Rigby in honour of Preston's most famous suffragette - early 20th century activists who fought for the right of women to vote. The carriageway links the A583 Blackpool Road and Riversway with the new junction 2 on the M55. Two smaller roads connect the dual carriageway to new and existing housing areas. The new roads also provide shared walking and cycling lanes.

“This project has been an excellent example of how finding the right partner though the Early Contractor Involvement process can produce the cooperative team necessary for such a complex and challenging project,” said Phill Wilson, project manager at Lancashire County Council. “Costain has played a vital part in the development, design and construction process for the Preston Western Distributor Project from commencing their involvement in 2016."

The Early Contractor Involvement phase began in 2016, three years before construction started. It gave Lancashire County Council cost and programme certainty by providing services including commercial management, value engineering advice, planning and project controls and stakeholder engagement.

For more information on companies in this article

Related Content

  • Tarmac’s low temperature Ultilow asphalt mix used in Edinburgh
    November 28, 2016
    UK construction firm and asphalt producer Tarmac reports that its Ultilow low temperature asphalt helped a Scottish client keep on top of its sustainability targets.
  • Belgium road crashes increase around road works
    May 16, 2018
    There has been an increase in the number of road crashes in Belgium around work zone sites. This problem has been identified by Belgium’s traffic safety institute, VIAS. In 2014 there were 588 road crashes around road work zones in Belgium. However the data shows that in 2016, there were 764 crashes around work zone areas. An increase in the number of road repair jobs is thought to be a factor in this jump in crashes in work zones. Of note is that comparatively few of the crashes occur on major highway rout
  • Poland targets 300km or new roads for Western Pomerania by 2023
    August 1, 2017
    Poland’s General Directorate for National Roads and Motorways (GDDKiA) plans to build around 300km of roads in Western Pomerania by 2023. The move is part of the National Roads Construction Programme. Among the project in the region that borders the country’s Baltic Sea coast is an S3 dual carriageway between the towns of Swinoujscie and Szczecin. Poland’s General Directorate for National Roads and Motorways (GDDKiA) plans to build around 300km of roads in Western Pomerania by 2023. The move is part of the
  • A new asphalt plant in Cameroon
    January 27, 2023
    A Lintec CSM4000 containerised asphalt plant in Cameroon has helped with the construction of the country’s first-ever expressway linking its two largest cities, Douala and Yaoundé. The new route replaces an older roadway in use for over three decades that no longer met traffic needs.