Skip to main content

Costain completes Preston Western Distributor

The Preston Western Distributor Project consists of a new motorway junction - the M55 Junction 2 - a dual carriageway and two connecting link roads in northern England.
By David Arminas July 10, 2023 Read time: 2 mins
Ecology and nature conservation were important considerations for the Preston Western Distributor Project (image courtesy Costain)

Costain has completed a €241 million road scheme linking the northern English city of Preston and the neighbouring Fylde region to the M55 motorway.

The Preston Western Distributor Project consists of a new motorway junction - the M55 Junction 2 - a dual carriageway and two connecting roads. Work was delivered on behalf of Lancashire County Council as part of the Preston, South Ribble and Lancashire City Deal, said Andy Clarke, integrated transport director at Costain.

Ecology and nature conservation were important considerations for the project. The plans were designed to restore farmland and to protect and enhance habitats for species including great crested newts, bats, birds, brown hare, hedgehogs and common toads. The project has delivered a net gain in biodiversity of around 10%, according the Costain, the contractor for the project.

In addition, all the removed soil was kept onsite and reused for landscaping around the new roads. Together with other initiatives such as renewable energy use and eliminating diesel across the project, Costain said it saved more than the equivalent of 6,000 tonnes of carbon dioxide.

The new dual carriageway is named after Edith Rigby in honour of Preston's most famous suffragette - early 20th century activists who fought for the right of women to vote. The carriageway links the A583 Blackpool Road and Riversway with the new junction 2 on the M55. Two smaller roads connect the dual carriageway to new and existing housing areas. The new roads also provide shared walking and cycling lanes.

“This project has been an excellent example of how finding the right partner though the Early Contractor Involvement process can produce the cooperative team necessary for such a complex and challenging project,” said Phill Wilson, project manager at Lancashire County Council. “Costain has played a vital part in the development, design and construction process for the Preston Western Distributor Project from commencing their involvement in 2016."

The Early Contractor Involvement phase began in 2016, three years before construction started. It gave Lancashire County Council cost and programme certainty by providing services including commercial management, value engineering advice, planning and project controls and stakeholder engagement.

For more information on companies in this article

Related Content

  • Concrete paving a smoother surface using machine control technology
    May 17, 2017
    Innovative technology has been used to deliver a smooth concrete road surface on a busy stretch of highway in Nebraska. Much-needed work on a busy section of Interstate 80 has been carried out in Nebraska to improve the road surface. This is one of the most important highways in the US, providing a link that stretches right across the country between the east and west coasts. This busy highway carries a high percentage of heavy truck traffic as it is a vital transport route. However this constant flow of la
  • Amey secures ITS deal with Transport Scotland
    January 3, 2022
    Amey will operate and maintain variable messaging signs, CCTV, emergency roadside telephones and various power and communication cabinets.
  • East End Crossing Project—Availability payment P3 in action
    July 14, 2017
    Indiana exercised its authority to use a P3 contract when it partnered with Kentucky for new bridges across the Ohio River. Barney Allison and John Smolen* explain the groundbreaking availability payment deal. Earlier this year, traffic began rolling over the new tolled Lewis and Clark Bridge spanning the Ohio River from northern Kentucky to southern Indiana. The cable-stayed bridge is part of the award-winning Ohio Bridges Project to untangle traffic within the greater metropolitan area of Louisville, Kent
  • New international trade crossing linking Canada and US
    June 9, 2015
    The Detroit River is short, only 45km, and narrow in places, less than 1km. Around a quarter of the annual $658 billion Canada-US trade crosses over the river. That’s $160 billion worth of goods trucked each year between Detroit in the US state of Michigan and the Canadian city of Windsor in the province of Ontario - the Windsor-Detroit Corridor. There are several types of crossings, but the vast majority of commercial traffic must use the 2.3km Ambassador Bridge (see box). A new bridge was initially prop