Skip to main content

Costain completes Preston Western Distributor

The Preston Western Distributor Project consists of a new motorway junction - the M55 Junction 2 - a dual carriageway and two connecting link roads in northern England.
By David Arminas July 10, 2023 Read time: 2 mins
Ecology and nature conservation were important considerations for the Preston Western Distributor Project (image courtesy Costain)

Costain has completed a €241 million road scheme linking the northern English city of Preston and the neighbouring Fylde region to the M55 motorway.

The Preston Western Distributor Project consists of a new motorway junction - the M55 Junction 2 - a dual carriageway and two connecting roads. Work was delivered on behalf of Lancashire County Council as part of the Preston, South Ribble and Lancashire City Deal, said Andy Clarke, integrated transport director at Costain.

Ecology and nature conservation were important considerations for the project. The plans were designed to restore farmland and to protect and enhance habitats for species including great crested newts, bats, birds, brown hare, hedgehogs and common toads. The project has delivered a net gain in biodiversity of around 10%, according the Costain, the contractor for the project.

In addition, all the removed soil was kept onsite and reused for landscaping around the new roads. Together with other initiatives such as renewable energy use and eliminating diesel across the project, Costain said it saved more than the equivalent of 6,000 tonnes of carbon dioxide.

The new dual carriageway is named after Edith Rigby in honour of Preston's most famous suffragette - early 20th century activists who fought for the right of women to vote. The carriageway links the A583 Blackpool Road and Riversway with the new junction 2 on the M55. Two smaller roads connect the dual carriageway to new and existing housing areas. The new roads also provide shared walking and cycling lanes.

“This project has been an excellent example of how finding the right partner though the Early Contractor Involvement process can produce the cooperative team necessary for such a complex and challenging project,” said Phill Wilson, project manager at Lancashire County Council. “Costain has played a vital part in the development, design and construction process for the Preston Western Distributor Project from commencing their involvement in 2016."

The Early Contractor Involvement phase began in 2016, three years before construction started. It gave Lancashire County Council cost and programme certainty by providing services including commercial management, value engineering advice, planning and project controls and stakeholder engagement.

For more information on companies in this article

Related Content

  • Benninghoven | Reducing the carbon footprint in asphalt production
    May 5, 2023
    Working more efficiently with sustainable and economical technologies is the challenge of today and tomorrow. Solutions from Benninghoven lower emissions and secure the future of asphalt mixing plant sites.
  • Smart motorway project for UK’s M3
    July 23, 2014
    Balfour Beatty is to work on a €163.5 million (£129 million) upgrade project for a 21.4km stretch of the M3 motorway in the UK. The work involves upgrading the route to smart motorway status and is being carried out for the UK Government’s Highways Agency. This project will increase capacity, reduce congestion and shorten journey times for the 120,000 motorists/day using the route. This section of the motorway runs through the counties of Hampshire and Surrey, between Junction 2 which is interchange with th
  • Tampere road tunnel - a strategic link for central Finland
    April 4, 2016
    Progress has been good for an important underground road link in Finland reports Adrian Greeman. Assuming all goes well, the new Ranta, or Lakeside, tunnel in Tampere will open in full six months early; traffic could be running by the end of this year. Work on transforming the rundown city centre with new developments will get a major boost. It is a major achievement on a four-year-long project bringing significant benefits to one of Finland's largest cities. From the government's point of view the scheme w
  • Key projects free up Auckland's congested motorway network
    June 14, 2012
    A number of key projects in Auckland, New Zealand will free-up the city’s congested motorway network - Mary Searle reports.Auckland is a sprawling city, home to 1.4 million people, one third of New Zealand’s total population. Until recently, greater Auckland comprised Auckland city, North Shore city over the harbour bridge to the north, Waitakere city to the west and Manukau city to the south. An amalgamation of these various cities’ councils, plus the regional council and three district councils into one,