Skip to main content

Contractors should use LED lights in Dutch tunnels

Dutch Minister of Infrastructure and Environment Melanie Schultz van Haegen wants all building contractors to use LED lights in the construction and renovation of tunnels in the Netherlands. The Minister said she will include this as a functional condition in contracts. Schultz van Haegen has stressed how LED lights consume less energy while emitting more light, making them a better option for lighting in tunnels.
August 27, 2013 Read time: 1 min
Dutch Minister of Infrastructure and Environment Melanie Schultz van Haegen wants all building contractors to use LED lights in the construction and renovation of tunnels in the Netherlands.

The Minister said she will include this as a functional condition in contracts. Schultz van Haegen has stressed how LED lights consume less energy while emitting more light, making them a better option for lighting in tunnels.

Related Content

  • Imtech announces major contracts
    April 26, 2012
    Dutch technical services provider Imtech has announced it has been awarded contracts totalling US$48.25 million in the fields of traffic infrastructure management and traffic management. The contracts also include technology solutions for traffic data collection in the UK, Belgium and Sweden, tunnel maintenance in the Netherlands and motorway water-related disruption prevention in Poland.
  • Industry leaders explore the road to efficient transport in new report
    May 4, 2012
    The US Department of Transportation Federal Highway Administration (FHWA) has awarded Delcan a contract to build a flexible, scalable and adaptable framework structure for Traffic Incident Management (TIM). Delcan is collaborating with SAIC on this effort.TIM is the practice of implementing a coordinated multi-disciplinary effort to swiftly clear traffic incidents off of roadways for increased public safety, more efficient mobility and reduce negative emission impacts on the environment.
  • Testing and striping underway for Seattle’s Alaskan Way tunnel
    October 18, 2018
    Crews have been working flat out on the Alaskan Way Tunnel in Seattle to install and test thousands of components and 90 interconnected systems.The client, Washington State Department of Transportation, said that Seattle Tunnel Partners began installation inside the double-deck State Route 99 tunnel in March after crews completed construction of the upper and lower roadways. STP said that testing could be complete by late September and the tunnel could open as soon as this fall after an approximate three-w
  • Bell Equipment launches two axle hauler with bigger payload
    April 9, 2018
    Bell Equipment is now offering a twin axle variant of its 28tonne capacity hauler called the B30E 4x4. This machine is aimed at use with small to medium-sized quarries that feature integrated aggregate production facilities. However the firm claims that the new machine offers distinct advantages over more conventional haulers. According to Bell Equipment product marketing manager, Tristan du Pisanie, the Bell B30E 4x4 offers a key alternative to the company's conventional 6x6 ADT. This new model provides a