Skip to main content

Colombia's roads to recovery

Colombia's Ministry of Transport is suggesting that the Avenida Longitudinal de Occidente (ALO) road project in Bogota should be carried out by Colombian energy company Empresa de Energia de Bogota (EEB).
February 8, 2012 Read time: 2 mins
Colombia's Ministry of Transport is suggesting that the Avenida Longitudinal de Occidente (ALO) road project in Bogota should be carried out by Colombian energy company 5808 Empresa de Energia de Bogota (EEB). If state owned EEB completes the works, the Government expects to save US$518 million as well as cutting out the need for three years worth of additional studies and tenders. Meanwhile the tender process for the Autopista de las Americas highway project should close at the end of April 2010, with a decision to be made in June 2010. The 4.2km Guillermo Leon Valencia tunnel is now open for traffic. Vehicles driving from Melgar to Bogota will no longer have to travel via Nariz del Diablo, and journey times will be shortened by more than 30 minutes. The cost of this tunnel project was estimated at $70 million when announced in 2002. The Ministry of Transport reports that the Bogota-Giradot road project is progressing well although there have been some delays. The road project will improve communications between Central Colombia and the west as well as the Pacific Coast. Some 200km of double lane road projects have been built on average during the last two years and this could reach 300km in 2010. In addition, La Linea tunnel construction works are finally proceeding as planned and the road from Calarca to this tunnel is within schedule. The Bogota-Buenaventura road should be completed within a maximum of five years. The Colombian authorities have signed the extensions to the Ruta Caribe, Barranquilla-Cartagena and Cordoba-Sucre road concessions. These projects are worth $623 million. Other road projects worth have been put out to tender and contracts for these schemes will be signed in June 2010. By extending the concessions, the government will be able to ensure that the works are carried out, through road toll systems. The Colombian institute for concessions, 1314 INCO, has remarked that the Cordoba-Sucre and Ruta Caribe projects should take seven years to complete and encompass 484km of road improvements.

For more information on companies in this article

Related Content

  • Asphalt plans silos increase efficiency, reduce waste
    May 8, 2012
    A Colombian contractor tackles specifications for asphalt road work with Astec equipment.Award-winning Colombian contractor MHC has upgraded its Astec Portable Double Barrel plant to handle highway and other projects. The plant, installed in Bucaramanga, equipped with two RAP [recycled asphalt pavement] bins, a Double Barrel Green System, and one New Generation silo was bought by MHC in 2009. It has now received a second silo and a truck scale extension.
  • Asphalt plans silos increase efficiency, reduce waste
    March 21, 2012
    A Colombian contractor tackles specifications for asphalt road work with Astec equipment. Award-winning Colombian contractor MHC has upgraded its Astec Portable Double Barrel plant to handle highway and other projects. The plant, installed in Bucaramanga, equipped with two RAP [recycled asphalt pavement] bins, a Double Barrel Green System, and one New Generation silo was bought by MHC in 2009. It has now received a second silo and a truck scale extension.
  • Colombia highway concession package awarded
    November 8, 2019
    A major highway concession package has been awarded to a consortium in Colombia. Concesionaria Vial Andina (Coviandina) has won the tender to manage the 85.6km road connecting capital Bogota with Villavicencio. The package was awarded by the national infrastructure agency (ANI). Under the terms of the deal, the firm will maintain two sections of the existing road and build a new dual carriageway stretch with two lanes in either direction for the third section. The third stretch poses particular challenges t
  • First phase of CS ETC project in Chile inaugurated
    March 16, 2012
    CS Communication & Systèmes has announced the inauguration of the first Fast ETC lanes which the company developed on the A5 Expressway (Ruta Del Maipo) that links Puerto Montt in South Chile with Santiago Del Chile.