Skip to main content

Colas drives measures to improve safety in Area 7 workzones

A pilot scheme in the United Kingdom by Colas and Solar and Electric Gates (S&EG) is using a new automatic gate to help protect operatives in Area 7 work zones. The Readi-Guard has been developed for the joint venture A-one+, led by infrastructure contractor Costain. Colas and S&EG joined forces to engineer the gate system, which opens horizontally to allow authorised vehicles into work areas. It safeguards workers because manual gate operation is not required. “The TM Access Gate is a well thought
December 11, 2015 Read time: 2 mins
A pilot scheme in the United Kingdom by Colas and Solar and Electric Gates (S&EG) is using a new automatic gate to help protect operatives in Area 7 work zones.

The Readi-Guard has been developed for the joint venture 2316 A-one+, led by infrastructure contractor 2319 Costain.

184 Colas and S&EG joined forces to engineer the gate system, which opens horizontally to allow authorised vehicles into work areas. It safeguards workers because manual gate operation is not required.

“The TM Access Gate is a well thought-out solution to an issue that poses considerable risk to our workforce and the wider traffic management community,” said Ryan Wood, technical manager at Colas.

“Working with S&EG we have been able to develop a system that eliminates exposure to live traffic in situations when operatives are required to open works accesses. It is designed for ease of deployment and use in short-term works but is equally suited to longer term work sites.

"The innovation is important for the partners of the joint venture A-one+ because of its highways maintenance work in England. Two years ago, A-one+ won a two-year extension to its five-year managing agent contract, awarded the then Highways Agency, now called 8100 Highways England.

Under the €81 million contract that ends in June next year, A-One+ is carrying out operational and routine maintenance services and highway improvements to the motorways and trunk roads in the East Midlands region of England.

For more information on companies in this article

Related Content

  • Germany builds its first major PPI autobahn project
    July 7, 2015
    Rebuilding of one of the oldest motorways in Germany is testing out the possibilities for public-private project road construction reports Adrian Greeman A freshly renovated section of the A8 Autobahn in southern Germany will be watched with some interest this summer as traffic begins driving along its rebuilt carriageway and additional third lanes. That is not because of any special road features, other than a distinctive reddish colour to its concrete surface, but because it is a first fullscale public
  • WJ Guardian system keeps stud installers safer in workzones
    January 26, 2017
    WJ’s latest innovation is a method of road stud installation designed to remove vulnerable operatives from the carriageway The bespoke design of the WJ Guardian system allows the complete road stud installation process to take place while protecting operatives within an integrated safety cell of an 18tonne truck. The UK has used 12 million road studs on its national and local road network, all requiring maintenance or replacement at some point. Traditional methods of installation by hand or milling ma
  • UK’s M3 motorway gets first orange emergency area
    August 1, 2017
    The first of a new-style smart motorway emergency stop area is being trialled on the M3 in England. The redesigned emergency area has a highly visible orange road surface and better signs to improve its visibility, according to Highways England, the wholly government-owned company responsible for modernising, maintaining and operating England’s motorways and major A roads.
  • Boom times for SRL
    December 14, 2021
    SRL Traffic Systems has announced an exclusive partnership with barrier and gate manufacturer Solar Gates UK to hire out the manufacturer’s INSTABOOM work zone barriers.