Skip to main content

Colas drives measures to improve safety in Area 7 workzones

A pilot scheme in the United Kingdom by Colas and Solar and Electric Gates (S&EG) is using a new automatic gate to help protect operatives in Area 7 work zones. The Readi-Guard has been developed for the joint venture A-one+, led by infrastructure contractor Costain. Colas and S&EG joined forces to engineer the gate system, which opens horizontally to allow authorised vehicles into work areas. It safeguards workers because manual gate operation is not required. “The TM Access Gate is a well thought
December 11, 2015 Read time: 2 mins
A pilot scheme in the United Kingdom by Colas and Solar and Electric Gates (S&EG) is using a new automatic gate to help protect operatives in Area 7 work zones.

The Readi-Guard has been developed for the joint venture 2316 A-one+, led by infrastructure contractor 2319 Costain.

184 Colas and S&EG joined forces to engineer the gate system, which opens horizontally to allow authorised vehicles into work areas. It safeguards workers because manual gate operation is not required.

“The TM Access Gate is a well thought-out solution to an issue that poses considerable risk to our workforce and the wider traffic management community,” said Ryan Wood, technical manager at Colas.

“Working with S&EG we have been able to develop a system that eliminates exposure to live traffic in situations when operatives are required to open works accesses. It is designed for ease of deployment and use in short-term works but is equally suited to longer term work sites.

"The innovation is important for the partners of the joint venture A-one+ because of its highways maintenance work in England. Two years ago, A-one+ won a two-year extension to its five-year managing agent contract, awarded the then Highways Agency, now called 8100 Highways England.

Under the €81 million contract that ends in June next year, A-One+ is carrying out operational and routine maintenance services and highway improvements to the motorways and trunk roads in the East Midlands region of England.

For more information on companies in this article

Related Content

  • The UK's massive road repair budget
    November 17, 2023
    The UK has announced a massive road repair budget.
  • Solar security with SOSEC barriers from Green Gate Access Systems
    December 7, 2017
    SOSEC, a mobile solar-powered barrier system for work sites, made its UK debut on the M23 motorway. The SOSEC gate – solar and security – is made by Green Gate Access Systems, a subsidiary of Solar Gates UK, which provides and installs solar and mains-powered gates, barriers and access control systems. The system on the M23 provided contractors with a power-free method to slow and control access to the work zone, track who is on site and prevent accidental entry from the public.
  • Balfour Beatty awarded €54.01 million A1 improvement scheme
    June 5, 2014
    Balfour Beatty has been awarded a €54.01 million (£43.9 million) contract to design and build the Highways Agency A1 Coal House to Metro Centre improvement scheme in Gateshead, north-east England. The project will include the introduction of new parallel link roads between the Lobley Hill and Gateshead Quay (A184) junctions and an increase in lane capacity on the A1 main line from two to three lanes in each direction from the Metro Centre to Coal House junction, a distance of 6.44kms.
  • Innovative new drainage solutions will help keep roads free from water
    October 2, 2014
    An array of new technologies will help optimise road drainage and minimise flooding risks - Mike Woof reports In the UK the specialist contractor Lanes Group has carried out extensive inspection work of the drainage systems for the M6 toll route around the city of Birmingham. A powerful zoom camera has been used to carry out the inspection work for Midland Expressway, which operates and maintains the 43km-long motorway, running from Coleshill to Cannock.