Skip to main content

Colas drives measures to improve safety in Area 7 workzones

A pilot scheme in the United Kingdom by Colas and Solar and Electric Gates (S&EG) is using a new automatic gate to help protect operatives in Area 7 work zones. The Readi-Guard has been developed for the joint venture A-one+, led by infrastructure contractor Costain. Colas and S&EG joined forces to engineer the gate system, which opens horizontally to allow authorised vehicles into work areas. It safeguards workers because manual gate operation is not required. “The TM Access Gate is a well thought
December 11, 2015 Read time: 2 mins
A pilot scheme in the United Kingdom by Colas and Solar and Electric Gates (S&EG) is using a new automatic gate to help protect operatives in Area 7 work zones.

The Readi-Guard has been developed for the joint venture 2316 A-one+, led by infrastructure contractor 2319 Costain.

184 Colas and S&EG joined forces to engineer the gate system, which opens horizontally to allow authorised vehicles into work areas. It safeguards workers because manual gate operation is not required.

“The TM Access Gate is a well thought-out solution to an issue that poses considerable risk to our workforce and the wider traffic management community,” said Ryan Wood, technical manager at Colas.

“Working with S&EG we have been able to develop a system that eliminates exposure to live traffic in situations when operatives are required to open works accesses. It is designed for ease of deployment and use in short-term works but is equally suited to longer term work sites.

"The innovation is important for the partners of the joint venture A-one+ because of its highways maintenance work in England. Two years ago, A-one+ won a two-year extension to its five-year managing agent contract, awarded the then Highways Agency, now called 8100 Highways England.

Under the €81 million contract that ends in June next year, A-One+ is carrying out operational and routine maintenance services and highway improvements to the motorways and trunk roads in the East Midlands region of England.

For more information on companies in this article

Related Content

  • Highways England reappoints Mott MacDonald to Change Advisory Board
    June 14, 2018
    Mott MacDonald will continue to manage Highways England’s Change Advisory Board and its websites for technical specifications four years after the initial appointment. The contract is due to finish in 2020, with the potential to extend service provision for two six-month increments at the end of the first year. Mott MacDonald said that the board is the essential forum which safeguards the technical development of Highways Agency Traffic Management Systems. Highways England relies on it to control its
  • Highways England reappoints Mott MacDonald to Change Advisory Board
    September 28, 2018
    Mott MacDonald will continue to manage Highways England’s Change Advisory Board and its websites for technical specifications four years after the initial appointment. The contract is due to finish in 2020, with the potential to extend service provision for two six-month increments at the end of the first year. Mott MacDonald said that the board is the essential forum which safeguards the technical development of Highways Agency Traffic Management Systems. Highways England relies on it to control its day-t
  • Kier’s strong financial performance
    September 20, 2018
    Kier Group has announced a strong financial performance for its full-year results to 30th June 2018. The results were bolstered in particular by a solid performance in its highways business. The company claims that this has reinforced the firm’s position as the UK’s leading provider of highways management and maintenance services. Over the 12 months, Kier has maintained its position as the lead supplier to Highways England. Securing two three-year extensions to 2021 and 2022 respectively worth over £250 m
  • Lanes removes 400tonnes of debris from flood-scheme tunnel in UK
    March 28, 2017
    It was “dirty work” for drainage engineers from Lanes Group in the UK when they recently removed 400tonnes of silt and debris from a culvert in northern England. Before sludge removal started, the 3m-wide concrete box culvert under the A38 on the outskirts of the city of Derby had been full almost to its roof. Lanes Group's East Midlands depot, based in Derby, desilted the culvert in a 17-day operation for North Midland Construction, working for Highways England, under its civil engineering framework.