Skip to main content

Chile’s crowded roads face further congestion

Road congestion is a growing problem in Chile as the country’s vehicle fleet is fast outstripping road capacity. In 15 of the county’s major urban areas, the vehicle fleet is growing 10 times quicker than the rate of road construction.
June 21, 2017 Read time: 2 mins
RSS

Road congestion is a growing problem in Chile as the country’s vehicle fleet is fast outstripping road capacity. In 15 of the county’s major urban areas, the vehicle fleet is growing 10 times quicker than the rate of road construction.

This finding is based on a study carried out between 2010 and 2015 by the Secretariat for Transportation Planning (SECTRA). The report reveals that total road length in the cities of Iquique-Alto Hospicio, Greater Valparaiso, Greater Santiago, Talca, Linares, Chillan-Chillan, Viejo, Greater Concepcion, Osorno, Puerto Montt, Ancud, Castro, Quellon and Coyhaique grew by 3% from 25,738km in 2010 to 26,446km in 2015. Unfortunately the vehicle fleet in the same cities jumped a massive 34% from over 1.7 million to nearly 2.3 million. Meanwhile the total distance travelled by cars in 2015 was 32,256,266km, an increase of 79.3% from the 17,983,382km in 2010.

Meanwhile there has also been a corresponding drop in the efficiency of public transport. SECTRA suggests that the city authorities need to start building roads, and fast. At the same time, more and better public transport is desperately needed according to SECTRA. Chile’s fast growing vehicle population has been a side effect of its strong economy.

Related Content

  • New Central Ring Road around Moscow to be built by 2018
    September 30, 2013
    Eugene Gerden evaluates Moscow’s new ring road mega project The Russian government plans to complete implementation of one of the most ambitious projects in the country’s road building industry in recent years, which involves construction of The Central Ring Road around Moscow by 2018. The new road should be built by the next presidential elections, while its length will be 339km. It is expected to be comprised of five sections and will be located 50km away from Moscow Ring Road, a ring road encircling the
  • AEM taking CONEXPO to Latin America with a Santiago show in October 2015
    January 6, 2017
    A new construction equipment show for the emerging markets surfaced today when CONEXPO Latin America was launched by the Milwaukee-based Association of Equipment Manufacturers (AEM). The trade body said the show was designed to “offer expanded opportunities to connect to markets in Central and South America”.
  • AEM taking CONEXPO to Latin America with a Santiago show in October 2015
    April 18, 2013
    A new construction equipment show for the emerging markets surfaced today when CONEXPO Latin America was launched by the Milwaukee-based Association of Equipment Manufacturers (AEM). The trade body said the show was designed to “offer expanded opportunities to connect to markets in Central and South America”.
  • Key deals show strength of Tolling solutions sector
    September 26, 2013
    The world’s leading tolling solution providers have achieved significant deals in recent months emphasising the importance of their latest and proven technology. Guy Woodford reports Kapsch TrafficCom North America (Kapsch), part of Kapsch TrafficCom Group, has been awarded a five-year US$30 million contract by Canadian Tolling Company International (Cantoll). The contract will see the leading tolling technology manufacturer supply its next generation TDMA V6 Interior Transponder, also known as an onboar