Skip to main content

Cengiz wins Corridor VC contract in Bosnia

Cengiz submitted the lowest bid in the tender which attracted three offers in the deal said to be worth around €361.8 million, according to Bosnia’s state highways agency Autoceste.
By David Arminas March 21, 2023 Read time: 2 mins
The majority of Corridor 5C crosses Bosnia and Herzegovina (image © Maia Persuh/Dreamstime)

Bosnia’s state highways agency Autoceste has chosen Turkish construction company Cengiz Insaat Sanayi to build the Medakovo-Ozimice section of European transport Corridor Vc.

Cengiz submitted the lowest bid in the tender which attracted three offers, according to Autoceste. The deal is worth €361.8 million for construction of the 21.3km section with work to be completed within 30 months.

The section includes one interchange, two rest areas, eight bridges and viaducts, two overpasses, 15 underpasses and one 2.2km-long tunnel.

The 700km-long Corridor 5c - or ‘Vc’ if using a Roman numeral - is a major pan-European transport link connecting Hungary and eastern Croatia to neighbouring Bosnia and Herzegovina and the Adriatic Sea. Corridor Vc connects the port of Ploce in Croatia with Budapest in Hungary, stretching some 340 km across Bosnia.

The majority of the route crosses Bosnia and Herzegovina and is a key priority for the European Bank for Reconstruction and Development (EBRD) and its partners, in particular the European Union, which helped fund the work. The project is financed through a loan provided by the European Investment Bank (EIB) and a grant from the European Union (EU).

Last December, Croatia opened a section of the Corridor 5c motorway between Halasica Bridge and the town of Beli Manastir.

Related Content

  • Croatia: Peljeski Bridge decision in summer 2017
    November 21, 2016
    Croatia’s minister of infrastructure, Oleg Butkovic, said a winner will be chosen to build the controversial Peljeski Bridge on the Adriatic Sea coast by summer 2017. The project, valued at around €370 million, will be carried out in three phases. In June, a tender was started by the national roads company Hrvatske Ceste but was halted last month over complaints by some bidders about pre-qualification issues. The State Commission for Control of Public Ordering recently rejected the pre-qualificatio
  • Budapest’s Széchenyi Chain Bridge to reopen
    November 29, 2022
    The 380m-long suspension bridge in the Hungarian capital was built between 1839 and 1849 and was the first permanent bridge connecting the towns of Buda and Pest, lying on opposite banks of the Danube River.
  • CT Ictas and Astaldi submit complaint over Peljeski Bridge award
    February 14, 2018
    Croatian media are reporting a dispute between two consortia and that of the China Road and Bridges over the Peljeski bridge project. Croatia’s national roads company Hrvatske Ceste chose China Road and Bridges but the decision is being challenged by a consortium led by the Italian firm Astaldi and one by Turkish CT Ictas. The two consortia submitted their complaints to the Croatian State Commission for Control of Public Ordering Processes in January only days after similar action by another consortia led
  • Tunnel contract for Bosnian highway
    December 17, 2012
    Turkish company Cengiz Insaat has reportedly been awarded the €115 million contract for the construction of the Suhodol-Tarcin motorway in Bosnia. The works, which will be done in cooperation with Bosnian company Euroasfalt, will include two tunnels. One of them will be 400m long, while the other will be 2.5km. Works are expected to be completed by 2014. Meanwhile, bids are now being offered for a major highway project in Bosnia. This follows the opening of the tender process for the project by Bosnian high