Skip to main content

Canada: doubts persist about proposed Howse Pass highway through Rocky Mountains

Alberta group attempts to revive the idea of a Howse Pass highway.
By David Arminas March 11, 2020 Read time: 2 mins
A Howse Pass road: beautiful but too costly (© Keeperofthezoo | Dreamstime.com)

The Provincial British Columbia government in western Canada has thrown cold water on the revived idea of building another major highway over the Rocky Mountains.

British Columbia – whose eastern territory is comprised mostly of the Rocky Mountain range – says the proposed Howse Pass shortcut from the neighbouring province of Alberta would be too costly. Also, the government is in the midst of major mountain road widening programme costing billions, according to reports by the Canadian Broadcasting Corporation.

The BC government was responding to comments by John Vandermeer, chairman of the Central Alberta Economic Partnership. He recently told media in Alberta that the huis organisation would like to undertake an economic development study for the region, which would include a reassessment of the viability of the Howse Pass route. It would run from central Alberta to the city of Kamloops in south-central British Columbia.

The 760km-drive from the central Alberta city of Red Deer to Kamloops starts by heading south to Calgary and then into BC. A Howse Pass route, touching 1,540m above sea level, would take drivers directly west from Red Deer into the Rockies and Banff National Park before crossing into BC. There are not towns or cites along this route which would be built through mostly wilderness areas in BC.

Howse Pass would, however, shave 94km off the southern Calgary route and join the Trans-Canada Highway near the BC town of Golden. The importance of all major roads across the mountains is access to the Pacific ports, mainly Vancouver, on the BC coast.

Vandermeer said a number of central Alberta municipal leaders are interested in the potential economic boost to central Alberta should a new mountain route be available.

But environmental groups are likely fight a Howse Pass route. It would also be tricky getting federal government permission because 34km of the route would pass through the federally-run world-renowned Banff National Park, a mostly wilderness area covering nearly 6,650km² and bordering BC.

Related Content

  • Fourth lane for Rome section of Italy’s A1
    June 28, 2023
    Under the agreement, around 16 hectares of trees will be planted, 3.4km of noise barriers installed and a network of cycle paths will be planned.
  • Global credit squeeze impacts Australia's road construction
    July 13, 2012
    Roads Australia steps up in policy debate as road construction feels the pinch of the credit squeeze, as Mark Bowmer (RA media director) reports Like all markets around the world, Australia is feeling the effects of the global credit squeeze and its impact on the delivery of major infrastructure projects such as roads. In Sydney, for example, lack of funding (both from government and private sources) is seen as the major stumbling block to the construction of a much-needed eastern extension to Sydney's main
  • Indonesia set for major PPP infrastructure tendering round
    March 10, 2015
    The Indonesian government is getting ready to tender for major infrastructure projects including roads to be developed under public-private partnership (PPP) contracts, the Jakarta Post reported. Public Works and Public Housing minister Basuki Hadimuljono said in Jakarta that the first priorities would be on the 94km Balikpapan-Samarinda toll road, the 7km Manado-Bitung toll road in North Sulawesi and a drinking water treatment system project in western Semarang, central Java. The projects will prove that P
  • Flatiron wins Winnipeg interchange project in Canada
    August 5, 2015
    US-based contractor Flatiron has won a US$157 million design and build contract for an interchange in the Canadian city of Winnipeg, in the province of Manitoba. The project, for owner Manitoba Infrastructure and Transportation, will replace the existing loop-ramp interchange for Provincial Trunk Highways 59 and 101. Work includes seven precast girder bridges between 40m and 100 meters in length, one cast-in-place box culvert through-pass, construction of 1.5 million cubic meters of interchange embank