Skip to main content

California turns towards a Texas solution for u-turn design

The first so-called Texas U-Turn in the US state of California has opened as part of the Gerald Desmond Bridge Replacement project at Long Beach. The design enables trucks and other vehicles to make a safe and free-flowing U-turn at the west end of the project at the port access undercrossing, a second tunnel near the intersection of Ocean Boulevard and State Route 47 (SR-47) on Terminal Island. The Texas U-turn - named because it is a common feature at intersections in the state of Texas - enables ve
July 24, 2019 Read time: 2 mins
Texas U-Turn: better traffic flow
The first so-called Texas U-Turn in the 972 US state of California has opened as part of the Gerald Desmond Bridge Replacement project at Long Beach.


The design enables trucks and other vehicles to make a safe and free-flowing U-turn at the west end of the project at the port access undercrossing, a second tunnel near the intersection of Ocean Boulevard and State Route 47 (SR-47) on Terminal Island.

The Texas U-turn - named because it is a common feature at intersections in the state of Texas - enables vehicles traveling on one side of a one-way road to make a U-turn onto the opposite road without stopping at a traffic signal.

“This traffic feature was proposed by the contractor to reduce the expense of building and maintaining flyover ramps for vehicles entering and leaving our Pier T complex at the Port of Long Beach,” said Duane Kenagy, capital programmes executive for the Port of Long Beach. “This nonstop U-turn is among many features of the new bridge that will provide a more efficient flow of cargo traffic in and out of our port.”

The US$1.47 billion project to replace the current Gerald Desmond Bridge will provide the Port of Long Beach and greater port complex with a bridge capable of meeting the needs for international cargo movement for the next 100 years.

When fully completed, the new cable-stayed bridge will include six traffic lanes and four emergency shoulders and a higher clearance than the current bridge to accommodate larger cargo ships. There will also be a bike and pedestrian path with scenic overlooks and more efficient transition ramps and connectors to improve traffic flow.

The new bridge, to be completed in spring 2020, is a joint effort of Caltrans – the state transportation department - and the Port of Long Beach, with additional funding support from the US Department of Transportation and the Los Angeles County Metropolitan Transportation Authority.

For more information on companies in this article

Related Content

  • Webuild to start on Pedemontana Lombarda
    December 15, 2022
    The new sections of the Pedemontana Lombarda motorway near Milan in northern Italy will deploy smart technology to help with maintenance of the infrastructure and traffic control.
  • Utah key highway connection project
    February 23, 2018
    Work is now complete for the second phase of the Mountain View Corridor project in the US state of Utah. The 4km greenfield roadway runs from 5400 South to 4100 South in West Valley City. The project was designed and built jointly by Michael Baker International, Ralph L Wadsworth and Staker Parsons. Phase two of the Mountain View Corridor project included 14 mainline bridges, as well as seven pedestrian bridges and intersection reconstruction, and vital safety improvements to accommodate growth in Salt Lake
  • JMT and Parsons get a Nice Bridge contract in the US state of Maryland
    July 7, 2015
    In the US state of Maryland, a joint venture of Johnson, Mirmiran & Thompson (JMT) and Parsons Brinckerhoff has won a contract to replace the Harry W. Nice Memorial Bridge. The Maryland Transportation Authority awarded the $1 billion contract to replace the bridge, also known as the Potomac River Bridge and which was opened in 1940. The tolled 2.7km two-lane continuous truss bridge on US 301 spans the Potomac River between Newburg in Maryland and Dahlgren in the state of Virginia. Construction of the
  • Climbing in Corpus Christi
    September 17, 2020
    The challenge for Doka on the new Harbor Bridge in Texas was to use the same formwork for each pylon despite each pylon’s different geometry.