Skip to main content

California turns towards a Texas solution for u-turn design

The first so-called Texas U-Turn in the US state of California has opened as part of the Gerald Desmond Bridge Replacement project at Long Beach. The design enables trucks and other vehicles to make a safe and free-flowing U-turn at the west end of the project at the port access undercrossing, a second tunnel near the intersection of Ocean Boulevard and State Route 47 (SR-47) on Terminal Island. The Texas U-turn - named because it is a common feature at intersections in the state of Texas - enables ve
July 24, 2019 Read time: 2 mins
Texas U-Turn: better traffic flow
The first so-called Texas U-Turn in the 972 US state of California has opened as part of the Gerald Desmond Bridge Replacement project at Long Beach.


The design enables trucks and other vehicles to make a safe and free-flowing U-turn at the west end of the project at the port access undercrossing, a second tunnel near the intersection of Ocean Boulevard and State Route 47 (SR-47) on Terminal Island.

The Texas U-turn - named because it is a common feature at intersections in the state of Texas - enables vehicles traveling on one side of a one-way road to make a U-turn onto the opposite road without stopping at a traffic signal.

“This traffic feature was proposed by the contractor to reduce the expense of building and maintaining flyover ramps for vehicles entering and leaving our Pier T complex at the Port of Long Beach,” said Duane Kenagy, capital programmes executive for the Port of Long Beach. “This nonstop U-turn is among many features of the new bridge that will provide a more efficient flow of cargo traffic in and out of our port.”

The US$1.47 billion project to replace the current Gerald Desmond Bridge will provide the Port of Long Beach and greater port complex with a bridge capable of meeting the needs for international cargo movement for the next 100 years.

When fully completed, the new cable-stayed bridge will include six traffic lanes and four emergency shoulders and a higher clearance than the current bridge to accommodate larger cargo ships. There will also be a bike and pedestrian path with scenic overlooks and more efficient transition ramps and connectors to improve traffic flow.

The new bridge, to be completed in spring 2020, is a joint effort of Caltrans – the state transportation department - and the Port of Long Beach, with additional funding support from the US Department of Transportation and the Los Angeles County Metropolitan Transportation Authority.

For more information on companies in this article

Related Content

  • Qatar starts work on the state’s longest cable stayed bridge
    April 23, 2019
    Qatar has started construction of a 1.2km cable-stayed bridge that will be the longest in the Gulf state. The bridge will have 20 pylons and 16 piers to reach the highest point of 30m. It is part of the Sabah Al-Ahmad Corridor project, according to the Public Works Authority of Qatar (Ashgal). With four lanes in each direction, the bridge will accommodate more than 16,000 vehicles a hour, according to Ashghal engineer Abdullah al-Naiemi. Comnpletion is set for early 2021. Meahwhile, the Haloul Int
  • Teams shortlisted for Pattullo Bridge replacement near Vancouver
    March 1, 2019
    The Canadian province of British Columbia has shortlisted three consortia to design and build a US$1.06 billion Pattullo Bridge replacement near Vancouver. Fraser Community Connectors is led by Kiewit Canada Development. Kiewet Infrastructure BC is the design-build contractor. The long-span bridge design contractors are T.Y. Lin International and International Bridge Technologies. A joint venture of Flatiron Constructors, Dragados Canada and Carlson Construction Pattullo includes ACS Infrastructure Ca
  • Stantec wins California roads study
    February 28, 2012
    Reduced congestion, better traffic flow and improved safety for road users are the aims of a new project for Orange County in the US State of California.
  • New traffic solutions for the UK
    July 15, 2015
    Two major developments being introduced will help optimise traffic flow on routes carrying high volumes of vehicles/day. An installation of Flexicon’s flexible conduit will help keep the traffic flowing on one of the busiest sections of the M6 motorway through Birmingham by protecting power and data cabling for overhead gantries and CCTV cameras. On behalf of Highways England, who is implementing a hard shoulder running scheme between junctions 5 and 8, contractor’s Carillion is using the 63mm diameter L