Skip to main content

California turns towards a Texas solution for u-turn design

The first so-called Texas U-Turn in the US state of California has opened as part of the Gerald Desmond Bridge Replacement project at Long Beach. The design enables trucks and other vehicles to make a safe and free-flowing U-turn at the west end of the project at the port access undercrossing, a second tunnel near the intersection of Ocean Boulevard and State Route 47 (SR-47) on Terminal Island. The Texas U-turn - named because it is a common feature at intersections in the state of Texas - enables ve
July 24, 2019 Read time: 2 mins
Texas U-Turn: better traffic flow
The first so-called Texas U-Turn in the 972 US state of California has opened as part of the Gerald Desmond Bridge Replacement project at Long Beach.


The design enables trucks and other vehicles to make a safe and free-flowing U-turn at the west end of the project at the port access undercrossing, a second tunnel near the intersection of Ocean Boulevard and State Route 47 (SR-47) on Terminal Island.

The Texas U-turn - named because it is a common feature at intersections in the state of Texas - enables vehicles traveling on one side of a one-way road to make a U-turn onto the opposite road without stopping at a traffic signal.

“This traffic feature was proposed by the contractor to reduce the expense of building and maintaining flyover ramps for vehicles entering and leaving our Pier T complex at the Port of Long Beach,” said Duane Kenagy, capital programmes executive for the Port of Long Beach. “This nonstop U-turn is among many features of the new bridge that will provide a more efficient flow of cargo traffic in and out of our port.”

The US$1.47 billion project to replace the current Gerald Desmond Bridge will provide the Port of Long Beach and greater port complex with a bridge capable of meeting the needs for international cargo movement for the next 100 years.

When fully completed, the new cable-stayed bridge will include six traffic lanes and four emergency shoulders and a higher clearance than the current bridge to accommodate larger cargo ships. There will also be a bike and pedestrian path with scenic overlooks and more efficient transition ramps and connectors to improve traffic flow.

The new bridge, to be completed in spring 2020, is a joint effort of Caltrans – the state transportation department - and the Port of Long Beach, with additional funding support from the US Department of Transportation and the Los Angeles County Metropolitan Transportation Authority.

For more information on companies in this article

Related Content

  • Dana set to buy drive systems segment of Oerlikon Group
    July 31, 2018
    Dana has signed an agreement to purchase the drive systems segment of the Switzerland-based Oerlikon Group for around US$600 million. The deal, pending regulatory approval, is expected to be completed by the end of the first quarter 2019 at the latest. Oerlikon’s drive systems business makes high-precision gears, planetary hub drives for tracked vehicles and products, controls and software that support vehicle electrification across the mobility industry.
  • Roadtec machines rebuild key highway in Texas
    December 16, 2013
    In the middle of central Texas lies Blanco County, which is in the state’s Hill Country. West of Austin and north of San Antonio, the county is traversed by the Blanco River and the Pedernales River, and two major highways, US Highway 290 and US Highway 281. Because of the proximity to two major cities, the highways carry heavy traffic volumes and US 281 in particular was in need of repair.
  • Norway mega-project contract for Fugro
    December 20, 2017
    The largest road project in Norway’s history has seen Fugro win a second major contract from the Norwegian Public Roads Administration (NPRA). The work on the E39 Coastal Highway is for the construction of a 1,100km route from Kristiansand in the south to Trondheim in central Norway. This project is expected cost around €34.4 billion (NOK 340 billion).
  • $66 billion for Florida transport infrastructure
    March 11, 2025
    $66 billion will be spent on Florida’s transport infrastructure over the next five years.