Skip to main content

California turns towards a Texas solution for u-turn design

The first so-called Texas U-Turn in the US state of California has opened as part of the Gerald Desmond Bridge Replacement project at Long Beach. The design enables trucks and other vehicles to make a safe and free-flowing U-turn at the west end of the project at the port access undercrossing, a second tunnel near the intersection of Ocean Boulevard and State Route 47 (SR-47) on Terminal Island. The Texas U-turn - named because it is a common feature at intersections in the state of Texas - enables ve
July 24, 2019 Read time: 2 mins
Texas U-Turn: better traffic flow
The first so-called Texas U-Turn in the 972 US state of California has opened as part of the Gerald Desmond Bridge Replacement project at Long Beach.


The design enables trucks and other vehicles to make a safe and free-flowing U-turn at the west end of the project at the port access undercrossing, a second tunnel near the intersection of Ocean Boulevard and State Route 47 (SR-47) on Terminal Island.

The Texas U-turn - named because it is a common feature at intersections in the state of Texas - enables vehicles traveling on one side of a one-way road to make a U-turn onto the opposite road without stopping at a traffic signal.

“This traffic feature was proposed by the contractor to reduce the expense of building and maintaining flyover ramps for vehicles entering and leaving our Pier T complex at the Port of Long Beach,” said Duane Kenagy, capital programmes executive for the Port of Long Beach. “This nonstop U-turn is among many features of the new bridge that will provide a more efficient flow of cargo traffic in and out of our port.”

The US$1.47 billion project to replace the current Gerald Desmond Bridge will provide the Port of Long Beach and greater port complex with a bridge capable of meeting the needs for international cargo movement for the next 100 years.

When fully completed, the new cable-stayed bridge will include six traffic lanes and four emergency shoulders and a higher clearance than the current bridge to accommodate larger cargo ships. There will also be a bike and pedestrian path with scenic overlooks and more efficient transition ramps and connectors to improve traffic flow.

The new bridge, to be completed in spring 2020, is a joint effort of Caltrans – the state transportation department - and the Port of Long Beach, with additional funding support from the US Department of Transportation and the Los Angeles County Metropolitan Transportation Authority.

For more information on companies in this article

Related Content

  • PPP project planned for Aruba
    November 29, 2013
    The Government in Aruba in the Caribbean is giving its approval for its second PPP transport infrastructure project, the Watty Vos Boulevard. The start of the tender process for the project is planned for the first quarter of 2014. PwC is the transaction advisor for the Contracting Authority, while the Dutch Ministry of Infrastructure and local legal firm Sjiem Fat & Co are also part of the team. The project will cost some US$120 million and involves the construction of a new arterial road 2x2 around Oranje
  • Yeti more autonomous snow-clearing by Semcon
    January 9, 2019
    Semcon, a Swedish applied automation company, said it has started an on-site project to clear snow from runway landing lights using autonomous vehicles. Most often the time-consuming job of clearing snow around landing lights has to be done manually because of the intricate maneouvres needed to avoid damaging the lighting systems. The trial project, which started this month, will be demonstrated in about a year’s time at Örnsköldsvik Airport, around 525km north of the Swedish capital Stockholm, accord
  • Rhode Island targets concrete roads for major noise reduction project
    October 10, 2012
    The Department of Transport in Rhode Island is about to set up a major noise reduction project on the area’s concrete road surfaces, many of which will be reformed overnight. Work begins now on I-195 in Providence and there will be overnight road closure for most of the Autumn. Nearly one year after the Rhode Island Department of Transportation opened the Iway's final ramp, the Rhode Island Department of Transport (RIDOT) has decided that it needs to reduce the high level of noise that the highway's concret
  • Us bridges pose cause for concern
    August 2, 2017
    On Aug 1st 2017, it was 10 years since the I-35W Bridge in Minneapolis collapsed. The bridge had been classified as structurally deficient and was undergoing repair at the time. However the repairs focussed on the decking rather than the structure, with the additional weight of the extra asphalt layers and the construction machinery parked adding to the total load and contributing to the collapse.