Skip to main content

California turns towards a Texas solution for u-turn design

The first so-called Texas U-Turn in the US state of California has opened as part of the Gerald Desmond Bridge Replacement project at Long Beach. The design enables trucks and other vehicles to make a safe and free-flowing U-turn at the west end of the project at the port access undercrossing, a second tunnel near the intersection of Ocean Boulevard and State Route 47 (SR-47) on Terminal Island. The Texas U-turn - named because it is a common feature at intersections in the state of Texas - enables ve
July 24, 2019 Read time: 2 mins
Texas U-Turn: better traffic flow
The first so-called Texas U-Turn in the 972 US state of California has opened as part of the Gerald Desmond Bridge Replacement project at Long Beach.


The design enables trucks and other vehicles to make a safe and free-flowing U-turn at the west end of the project at the port access undercrossing, a second tunnel near the intersection of Ocean Boulevard and State Route 47 (SR-47) on Terminal Island.

The Texas U-turn - named because it is a common feature at intersections in the state of Texas - enables vehicles traveling on one side of a one-way road to make a U-turn onto the opposite road without stopping at a traffic signal.

“This traffic feature was proposed by the contractor to reduce the expense of building and maintaining flyover ramps for vehicles entering and leaving our Pier T complex at the Port of Long Beach,” said Duane Kenagy, capital programmes executive for the Port of Long Beach. “This nonstop U-turn is among many features of the new bridge that will provide a more efficient flow of cargo traffic in and out of our port.”

The US$1.47 billion project to replace the current Gerald Desmond Bridge will provide the Port of Long Beach and greater port complex with a bridge capable of meeting the needs for international cargo movement for the next 100 years.

When fully completed, the new cable-stayed bridge will include six traffic lanes and four emergency shoulders and a higher clearance than the current bridge to accommodate larger cargo ships. There will also be a bike and pedestrian path with scenic overlooks and more efficient transition ramps and connectors to improve traffic flow.

The new bridge, to be completed in spring 2020, is a joint effort of Caltrans – the state transportation department - and the Port of Long Beach, with additional funding support from the US Department of Transportation and the Los Angeles County Metropolitan Transportation Authority.

For more information on companies in this article

Related Content

  • Realigning Kenyan bypass to avoid quagmire and ease congestion
    March 21, 2012
    Japanese consultants are planning to realign a Kenyan bypass, as Shem Oirere reports. Japanese consultants are resolving an engineering quagmire involving a 17.5km bypass in Kenya's Coast region. The new design realigning the bypass is underway by Japanese International Cooperation Agency (JICA) consultants. The road is an alternative link from the hinterland to the south coast and to the proposed Dongo Kundu Port. The 23m-wide bypass would also serve to reduce traffic congestion across the Likoni Channel t
  • US industry groups launch web-based platform PavementDesigner.org
    February 23, 2018
    A new online concrete pavement design tool has been launched in the US by three major cement and concrete organisations. PavementDesigner.org – available free of charge - was created for city, county, and consultant engineers as well as academics and anyone involved in design of roadway, industrial, and parking area pavements. PavementDesigner improves upon traditional pavement design software programs, according to its creators. The platform is being offered completely free of charge by the American
  • Texas highway contract
    January 22, 2018
    Michael Baker International has been awarded a US$6.1 million contract by the Texas Department of Transportation (TxDOT). The contract is for Construction Engineering and Inspection (CEI) services for the Lowest Stemmons Freeway project. The Lowest Stemmons project, a 3.7km stretch of Interstate-35E (I-35E), runs from Interstate-30 to north of Oak Lawn Avenue in Dallas. The aim of the project is to reduce congestion, improve mobility and deliver more reliable travel times. The project is also the first for
  • Increased mobility for Mexico
    June 14, 2012
    Urban mobility is high on the infrastructure agenda in Mexico. Business News Americas spoke with Salvador Herrera, executive director of the Centre for Sustainable Transport (CTS), about the elements of a sustainable transport system and Mexico City's addiction to the car At the heart of Mexico City's transport policy is a contradiction that is typical of the country as a whole. The government is spending big on Line 12 of the metro system and has introduced the first Metrobús bus rapid transit (BRT) l