Skip to main content

Businesses want Crnaja Tunnel delay

The tunnel is on Bosnia’s M17 highway, part of European route E73.
By David Arminas September 25, 2020 Read time: 1 min
Time on their hands: delays could be in store for work on Bosnia’s Crnaja Tunnel (photo © Piotr290/Dreamstime)

A major business association in Bosnia wants renovation work on the Crnaja Tunnel to be delayed until better bypass routes can be planned.

In a letter to the government, the Union of Business of Federal Bosnia and Herzegovina said work on the two-lane tunnel would greatly disrupt truck transport along on the Jablanica-Konjic segment of the M-17 highway. Now, during a time when many businesses are suffering financial loss due to the COVID pandemic, is not the time to further hamper any economic recovery.

The M17 is part of European route E73 and runs from northern Croatian border in Šamac towards southern Croatian border near Čapljina.

A €6.5 million contract for reconstruction of the road section and tunnel was announced in June last year and is being funded by the International Bank for Reconstruction and Development as well as the European Investment Bank.

The project has run into poor soil conditions and road transport is often severely disrupted because few alternative routes exist for heavy goods vehicles, noted a report by the Bosnian national news agency FENA.

Related Content

  • Increasing importance of alternate truck routes
    February 14, 2012
    The fabled Silk Route from China to Europe takes many forms, and is again becoming increasingly important as Patrick Smithreports The ancient Silk Road was never a single caravan route, but covered hundreds of kilometres in width extending in length for around 10,000km. This is the view of the European International Road Transport Union (IRU), and many other countries and organisations, who point out that it is a system of routes covering many countries via a series of branch roads that dates back some 2
  • Pocitelj Bridge reaches banks of Neretva River
    August 21, 2023
    Contractors are working to correct a concrete issue on a section of the 100m-long continuous prestressed girder bridge across the Neretva River in Bosnia and Herzegovina.
  • S&P Global Rating: credit stability for toll road operators
    August 14, 2017
    The outlook is generally stable for business conditions and credit quality for toll roads worldwide, according to the latest survey from ratings agency S&P Global.The exception is the US where the overall outlook is “positive”, noted the report S&P Global Ratings' 2017. The 21-page report considers broad economic and industry-specific trends. It looks at economic conditions, demographic trends and geopolitical risks that affect the movement of people and goods. “We expect stable or improving, but still frag
  • Stonehenge Tunnel project faces further questions
    May 22, 2019
    Plans to construct a tunnel link for the A303 route past the famous Stonehenge monument have hit further problems.