Skip to main content

Bids in for Bucharest Ring Motorway segment

The 101km-long motorway - also called the Bucharest Belt Motorway and the A0 Motorway -will be an outer ring highway to the existing inner Bucharest Ring Road around the Romanian capital city.
By David Arminas April 3, 2024 Read time: 2 mins
Congestion will be eased on Bucharest’s existing ininer Ring Road when the outer Ring Motorway around Romania’s capital city is finished (© LCVA/Dreamstime)

Bids have been submitted for resumption of work on the Cernica Passage and widening to four lanes of 11km of the Bucharest Ring Motorway.

The bids have come from mainly Romanian contractors but include some from Bulgaria and one from both Spain and Ukraine. Th contract value is estimated to be around €92.2 million.

The group headed by the Romanian company MARISTAR COM includes the Bulgarian companies of HYDROSTROY and PATSTROY VDH.

CONI, from Romania, leads a group that includes GOTT STASSE and PERFECT CONSULT EUROPE, also from Romania, and INFRA EXPERT from Bulgaria.

PRECON TRANSILVANIA heads up the all Romanian group consisting of SELINA and IBB-HIB ROMANIA.

ROMAIR CONSULTING leads the group containing  OYL COMPANY HOLDING, OPR ASFALT and, from Spain, OBRAS PUBLICAS Y REGADIOS.

Finally, CONCELEX is working with X-WAY INFRASTRUCTURE and BOG’ART – all from Romania - as well as AUTOMAGISTRAL PIVDEN, based in Odessa, Ukraine.

The 101km-long Bucharest Ring Motorway - also called the Bucharest Belt Motorway and the A0 Motorway - is intended to be an outer ring highway to the existing inner Bucharest Ring Road. When finished, it will A1, A2 and A3 motorways.  

Last November, the first segment of the section of the ring motorway opened - between the A3 motorway and national road DN1. In December the only section to be completed on the southern section opened to traffic - between DN5 and DN6.
 

Related Content

  • Poland's highway plans to go ahead
    May 15, 2012
    In Poland, the European Investment Bank has committed itself to maintaining its loan agreement for the A1 highway, despite recent problems over the project. The e1.1 billion loan that the EIB had agreed with Autostrada Poludnie for construction of a 180km section of the A1 highway from Strykow to Pyrzowice, will now be placed at the disposal of the Polish highway authorities. To carry out the work, Poland has to raise a further e503 million, which could be obtained from an issue of road bonds. Autostrada Po
  • US$177mn to build Bolivia’s Caracollo-Confital road, vice-president states
    September 24, 2013
    The construction of a 74km road between Caracollo and Confital in Bolivia will cost around US$177 million, the country’s vice-president Alvaro Garcia Linera has revealed. The contract for the project has been put out to tender. Companies have until 8 November 2013 to submit their proposals. The contract will be signed on 23 December 2013.
  • Bidding for Czech highway deals
    July 30, 2012
    The tender process for upgrade works on the D1 highway in the Czech Republic is attracting international bidding. The five sections of highway are worth €173.2 million in all, with investments of €59 million planned for 2012. Companies entering bids so far include Metrostav, Skanska, Strabag, Eurovia CS, Swietelsky Stavebni, OHL ZS, Dalnicni Stavby Praha. Bidders also include several consortia including one comprising M-Silnice, Bogl a Krysl and Berger Bohemia and one made up of Hochtief CZ and Silnice Casl
  • Strabag wins Polish road contract
    September 17, 2018
    Austrian contractor Strabag has won a stake in a design and build road contract in Poland. The project is worth a total of €133 million and involves building a section of highway carrying three lanes in either direction. The firm will work on the project to build another stretch of the A1 highway in Poland. The 17km long Section C begins at the Kamieńsk junction and ends at Radomsko, where the construction of a motorway interchange forms part of the order.