Skip to main content

Bids in for Bucharest Ring Motorway segment

The 101km-long motorway - also called the Bucharest Belt Motorway and the A0 Motorway -will be an outer ring highway to the existing inner Bucharest Ring Road around the Romanian capital city.
By David Arminas April 3, 2024 Read time: 2 mins
Congestion will be eased on Bucharest’s existing ininer Ring Road when the outer Ring Motorway around Romania’s capital city is finished (© LCVA/Dreamstime)

Bids have been submitted for resumption of work on the Cernica Passage and widening to four lanes of 11km of the Bucharest Ring Motorway.

The bids have come from mainly Romanian contractors but include some from Bulgaria and one from both Spain and Ukraine. Th contract value is estimated to be around €92.2 million.

The group headed by the Romanian company MARISTAR COM includes the Bulgarian companies of HYDROSTROY and PATSTROY VDH.

CONI, from Romania, leads a group that includes GOTT STASSE and PERFECT CONSULT EUROPE, also from Romania, and INFRA EXPERT from Bulgaria.

PRECON TRANSILVANIA heads up the all Romanian group consisting of SELINA and IBB-HIB ROMANIA.

ROMAIR CONSULTING leads the group containing  OYL COMPANY HOLDING, OPR ASFALT and, from Spain, OBRAS PUBLICAS Y REGADIOS.

Finally, CONCELEX is working with X-WAY INFRASTRUCTURE and BOG’ART – all from Romania - as well as AUTOMAGISTRAL PIVDEN, based in Odessa, Ukraine.

The 101km-long Bucharest Ring Motorway - also called the Bucharest Belt Motorway and the A0 Motorway - is intended to be an outer ring highway to the existing inner Bucharest Ring Road. When finished, it will A1, A2 and A3 motorways.  

Last November, the first segment of the section of the ring motorway opened - between the A3 motorway and national road DN1. In December the only section to be completed on the southern section opened to traffic - between DN5 and DN6.
 

Related Content

  • 'Soft' option gets results
    February 8, 2012
    Soft engineering techniques, used to prevent soil erosion and stabilise steep cuts and embankments, have allowed engineers to successfully widen the M1 motorway in the UK. Over the 50km length of the work (25km northbound, 25km southbound) on a busy section of the motorway near the city of Nottingham, a total of 48km of slopes had to be modified, split roughly between cutting and embankment. The UK Highways Agency requirements for the work meant that wholesale widening of the corridor was not possible: the
  • Polish projects lined up
    July 3, 2012
    The Polish authorities are calling tenders for eight sections of a delayed stretch of the A1 highway. The 180km section is between Strykow to Pyrzowice and the tenders will be for design and construction work. The project is worth €1.8 billion and the contracts are expected to be signed in September of this year, with construction commencing in the second half of 2011 and due for completion in 2014. Meanwhile, over €84 million is being invested on a ring road construction project around Przemysl. Approval h
  • Consortium wins St Petersburg bypass contract
    February 27, 2012
    A civil engineering tender worth U$4.73 billion for work in Saint Petersburg, Russia, has been awarded to a consortium of Russian, Italian and Turkish companies.
  • ASECAP: maintenance mindshift turns spending into investment
    August 4, 2017
    With an estimated value of €8 trillion, the road infrastructure is probably the European Union’s largest single asset. It accounts for 83% of passenger journeys and more than 70% of freight movement. Despite this importance, global investment in roads - especially maintenance - has fallen, said Christophe Nicodeme, European Road Federation secretary general. There are grave consequences, noted Nicodeme in his opening keynote address to the recent Study and Information Days gathering, an annual event for mem