Skip to main content

Bechtel-Enka win North Macedonia deal

The US-Turkish joint venture will build four sections of the European Corridors VIII and X in the Balkan country north of Greece.
By David Arminas March 21, 2023 Read time: 2 mins
The North Macedonian capital Skopje is on European Route VIII (image © Salahudin/Dreamstime)

North Macedonia has signed a €1.3 billion deal with US-Turkish joint venture Bechtel-Enka for construction of four sections of the European Corridors VIII and X.

The total length of construction will be around 110km. The sections are Tetovo-Gostivar, Gostivar-Bukojchani, Trebenishte-Struga-Kjafasan and Prilep-Bitola, Ejup Rustemi, according to North Macedonia's Public Enterprise for State Roads.

Corridor VIII is an east-west route connecting Albania's Adriatic port of Durres to the Bulgaria's Black Sea port of Varna via North Macedonia. Corridor X runs from Austria's Salzburg in the north to Greece's Thessaloniki in the south.

North Macedonia recently sent out an Invitation for Expressions of Interest for Construction Supervision For Road Corridor VIII Kichevo-Bukojchani section.

In January, the state highways agency signed a €9.7 million contract with the Macedonian  construction company Granit for work on the A4 motorway which connects the capital Skopje to the border with Kosovo. Work includes widening of an existing road from the Kosovo border to the village of Blace village and construction of a part of the A4 motorway to connect the village with another local road.

Road construction business Granit, based in Skopje, was a state-owned company until it was privatised in 1996. The company owns several concrete and asphalt plants as well as stone quarries.

For more information on companies in this article

Related Content

  • Europe closes in on the crossings
    September 27, 2017
    The Mersey Gateway bridge project off England’s west coast passed a milestone recently with the first joining of two of the deck sections. The key segments, as the sections are called, link the north approach viaduct to the north pylon deck span and are the first of four deck-joins scheduled for this summer. In total, there are five sections of bridge deck and approach roads that need to be joined.
  • Work starts on Banja Luka-Prijedor highway
    November 18, 2021
    The highway in Republika Srpska is part of the Banja Luka-Novi Grad motorway.
  • Israel investing in infrastructure
    February 13, 2012
    The tender process is opening for Israel's Road 531 project, which will link Tel Aviv with Sharon. The highway contract will form part of the country's largest ever road project, according to the Israel National Roads Company.
  • Israel investing in infrastructure
    May 3, 2012
    The tender process is opening for Israel's Road 531 project, which will link Tel Aviv with Sharon. The highway contract will form part of the country's largest ever road project, according to the Israel National Roads Company.