Skip to main content

Bechtel-Enka win North Macedonia deal

The US-Turkish joint venture will build four sections of the European Corridors VIII and X in the Balkan country north of Greece.
By David Arminas March 21, 2023 Read time: 2 mins
The North Macedonian capital Skopje is on European Route VIII (image © Salahudin/Dreamstime)

North Macedonia has signed a €1.3 billion deal with US-Turkish joint venture Bechtel-Enka for construction of four sections of the European Corridors VIII and X.

The total length of construction will be around 110km. The sections are Tetovo-Gostivar, Gostivar-Bukojchani, Trebenishte-Struga-Kjafasan and Prilep-Bitola, Ejup Rustemi, according to North Macedonia's Public Enterprise for State Roads.

Corridor VIII is an east-west route connecting Albania's Adriatic port of Durres to the Bulgaria's Black Sea port of Varna via North Macedonia. Corridor X runs from Austria's Salzburg in the north to Greece's Thessaloniki in the south.

North Macedonia recently sent out an Invitation for Expressions of Interest for Construction Supervision For Road Corridor VIII Kichevo-Bukojchani section.

In January, the state highways agency signed a €9.7 million contract with the Macedonian  construction company Granit for work on the A4 motorway which connects the capital Skopje to the border with Kosovo. Work includes widening of an existing road from the Kosovo border to the village of Blace village and construction of a part of the A4 motorway to connect the village with another local road.

Road construction business Granit, based in Skopje, was a state-owned company until it was privatised in 1996. The company owns several concrete and asphalt plants as well as stone quarries.

For more information on companies in this article

Related Content

  • Zimbabwe highway project linking with its neighbours
    November 28, 2016
    Zimbabwe’s Beitbridge to Chirundu highway link now looks set for a complete upgrade. The project has been planned for over 10 years but has faced a series of setbacks and delays, with funding having proved one of the biggest stumbling blocks in the past. The 897km highway runs from Beitbridge, located on the border with South Africa in the south of Zimbabwe all the way up to Chirundu, which is just over the border with Zambia in the north. The route includes part of the A4 highway in the south and the A1 hi
  • CPB Contractors closes deal for Melbourne’s West Gate Tunnel
    December 13, 2017
    CPB Contractors has achieved contractual close on Melbourne’s planned 5km West Gate Tunnel, originally called the Western Distributor. The road will link the West Gate Freeway at Yarraville, a suburb of Melbourne, with the tolled CityLink road network at Docklands via a tunnel beneath Yarraville.
  • Pocitelj Bridge reaches banks of Neretva River
    August 21, 2023
    Contractors are working to correct a concrete issue on a section of the 100m-long continuous prestressed girder bridge across the Neretva River in Bosnia and Herzegovina.
  • Albania prequalifying for bypasses around Vlore and Fier
    October 5, 2017
    Albania is pre-qualifying contractors for two major bypass projects, according to the European Bank for Reconstruction and Development. One is for construction of a 29km bypass of the southern Adriatic port city of Vlore with work expected to take 27 months. Vlore, with a population or around 130,000, is the country’s third largest city.