Skip to main content

Bechtel-Enka win North Macedonia deal

The US-Turkish joint venture will build four sections of the European Corridors VIII and X in the Balkan country north of Greece.
By David Arminas March 21, 2023 Read time: 2 mins
The North Macedonian capital Skopje is on European Route VIII (image © Salahudin/Dreamstime)

North Macedonia has signed a €1.3 billion deal with US-Turkish joint venture Bechtel-Enka for construction of four sections of the European Corridors VIII and X.

The total length of construction will be around 110km. The sections are Tetovo-Gostivar, Gostivar-Bukojchani, Trebenishte-Struga-Kjafasan and Prilep-Bitola, Ejup Rustemi, according to North Macedonia's Public Enterprise for State Roads.

Corridor VIII is an east-west route connecting Albania's Adriatic port of Durres to the Bulgaria's Black Sea port of Varna via North Macedonia. Corridor X runs from Austria's Salzburg in the north to Greece's Thessaloniki in the south.

North Macedonia recently sent out an Invitation for Expressions of Interest for Construction Supervision For Road Corridor VIII Kichevo-Bukojchani section.

In January, the state highways agency signed a €9.7 million contract with the Macedonian  construction company Granit for work on the A4 motorway which connects the capital Skopje to the border with Kosovo. Work includes widening of an existing road from the Kosovo border to the village of Blace village and construction of a part of the A4 motorway to connect the village with another local road.

Road construction business Granit, based in Skopje, was a state-owned company until it was privatised in 1996. The company owns several concrete and asphalt plants as well as stone quarries.

For more information on companies in this article

Related Content

  • Poland's ambitious highway construction plans
    July 10, 2012
    The European football championships are among a number of things pushing Poland's ambitious highway building programme. Patrick Smith reports. Poland is planning to spend a colossal €4.57 billion on road projects in 2009, a 35% increase over the previous year. T
  • Poland calls a tender for work on the Biskupia Gorka viaduct
    May 25, 2017
    Poland will have to spend around €7.12 billion to complete its section of the trans-European Via Carpathia. Work on the north-south transport corridor could be completed by 2025, the government said during a recent European Economic Congress held in the Polish city of Katowice. The route is planned to run nearly 1,600km from the Lithuanian Baltic Sea port city of Klaipeda to the Greek city of Thessaloniki on the Aegean Sea. It passes through Poland, Slovakia, Hungary, Romania and Bulgaria. It will cross cor
  • Polish road works continue for STRABAG
    March 1, 2022
    Work on a Polish road project continues for STRABAG.
  • Astaldi wins contract for part of Romania’s Brasov–Oradea motorway
    April 19, 2016
    Italian contractor Astaldi, as part of a joint venture, has won a €100 million contract to build of motorway in Romania. The contract is 18km of the Brasov–Oradea section of the partially built A3 Autostrade, a 584km route that runs north to south, from the border with Hungary to the capital Bucharest. Astalsi’s design and construction work includes three viaducts, five overpasses, three flyovers, and one motorway interchange. Work will begin in May and last for 16 months. Work on the Brasov-Oradea