Skip to main content

Australian project in hand

Plans are now well in hand for Australia's new Hill M2 highway in Sydney.
February 29, 2012 Read time: 1 min
Plans are now well in hand for Australia's new Hill M2 highway in Sydney. An agreement has been struck by the authorities in New South Wales (NSW) and road tolling firm the 3365 Transurban Group for the project. Construction work for the US$544 million (A$550 million) project is expected to start in December of this year and is due for completion in 2013. Much of the work will be carried out by 2685 Leighton Contractors.

For more information on companies in this article

Related Content

  • US$766.15bn to be invested in China road network expansion
    June 24, 2013
    Over the next 17 years, China will invest US$766.15 billion (CNY 4.70tn) to expand the country's major road network by over two times. By 2030, the length of roads in China is expected to total 5.8 million kilometres, with trunk ways and highways making up 7% of the total. Provincial and countryside roads are expected to account for 9% and 84% respectively. According to a road expansion blueprint approved in May 2013 by the State Council, the length of toll-free trunk ways and toll highways should by 2030 i
  • Australia’s road safety problems are a cause for concern
    January 23, 2019
    The Australian Road Research Board (ARRB) has highlighted key problems with road safety. According to the ARRB, these issues must be addressed if Australia’s road casualty rate is to be reduced. Road death tolls are being reduced as he latest results show, but more work needs to be done. According to the ARRB, the road death tolls in Victoria dropped 20% for 2018 when compared with the previous year. This is a major improvement, showing the gains made by Victoria’s road agency VicRoads and the state’s Tr
  • Tunnelling in Montenegro with XCMG equipment
    October 19, 2017
    Tunnelling equipment from Chinese firm XCMG has played an important role in a project in Montenegro. The work was carried out by contractor CCCC Tunnel Engineering Company and involved the excavation of the Jabuka Tunnel Works. This link forms part of the North-South Expressway of Montenegro and was completed on schedule recently. The link is of note as it is the first-ever expressway in Montenegro. Due to the country’s hills, a stretch of tunnel was a necessity.
  • Golden Gate Bridge gets Lindsay Transportation Solutions barrier
    March 10, 2015
    The iconic Golden Gate Bridge in California is now benefiting from the introduction of a new moveable barrier. Supplied by US specialist Lindsay Transportation Solutions, formerly Barrier Systems, and a division of Lindsay Corporation, this purpose-built moveable central divider will help maximise capacity while simultaneously boosting safety on the landmark structure. Constructed in the 1930s and first opened to traffic in 1937, the Golden Gate has coped extremely well with the years. Soundly engineered,