Skip to main content

Australian capital Canberra looks to upgrade street lighting

The Australian Capital Territory (ACT) Government said it is seeking proposals for the management of Canberra city’s 79,000 streetlights to improve cost and energy efficiencies.
September 12, 2016 Read time: 1 min

The Australian Capital Territory (ACT) Government said it is seeking proposals for the management of Canberra city’s 79,000 streetlights to improve cost and energy efficiencies.

The city wants to not only save energy and money, but to use the network of lights for so-called ‘smart city’ applications, such as a public wi-fi network.

A request for proposal is open until 6 October, according to a government notice.

The model for maintaining Canberra’s publicly-owned streetlight network was developed in consultation with industry during the Request for Expressions of Interest process in November last year.

The ACT Government owns and manages one of the nation’s largest portfolios of 79,000 lights on streets, footpaths, arterial roads and in public parks and open spaces around Canberra.

The chosen street lighting provider will manage all streetlights, including operations, maintenance and electricity supply. It will also implement an energy efficiency upgrade that delivers guaranteed energy savings to the ACT as well as create a flexible “smart city backbone”.

This backbone will support services such as smart parking, traffic management and environmental monitoring, which can help make our city more liveable, productive and sustainable, the government said.

For further details, please visit the %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Tenders ACT website Visit Tenders ACT Website false http://www.tenders.act.gov.au/ false false%>

Related Content

  • Hitachi Zaxis 5 wheeled excavators deliver performance
    January 6, 2017
    Hitachi Construction Machinery is showing four models from its Zaxis 5 range of wheeled excavators. The ZX140W-5, ZX170W-5, ZX190W-5 and ZX220W-5 all feature Isuzu Stage IIIB emissions-compliant engines powering the HIOS III hydraulic system. They benefit from increased lifting capacities, as the power boost function has been increased by 11%. The machines have a revised ROPS cab that has been redesigned to improve visibility. A new monitor sits on the right-hand pillar with a rear-view camera providing vis
  • Hitachi Zaxis 5 wheeled excavators deliver performance
    April 16, 2013
    Hitachi Construction Machinery is showing four models from its Zaxis 5 range of wheeled excavators. The ZX140W-5, ZX170W-5, ZX190W-5 and ZX220W-5 all feature Isuzu Stage IIIB emissions-compliant engines powering the HIOS III hydraulic system. They benefit from increased lifting capacities, as the power boost function has been increased by 11%. The machines have a revised ROPS cab that has been redesigned to improve visibility. A new monitor sits on the right-hand pillar with a rear-view camera providing vis
  • Zoomlion’s new RT series of mobile cranes offer up to 61m of reach
    January 6, 2017
    Large cabs and extensive reach capabilities are key features of Zoomlion’s new RT series of mobile cranes built specifically for the North American market. According to Larry Tate, service and parts manager for Zoomlion, “we’ve used the best components available (and) improved parts availability too.” The RT65 mobile crane features a longer, five-section, 43m boom. “That’s without the jib,” Tate said. “Pull out the jib and the insert and you get another 18m.” This extra reach has extensive benefit to contra
  • Zoomlion’s new RT series of mobile cranes offer up to 61m of reach
    March 11, 2014
    Large cabs and extensive reach capabilities are key features of Zoomlion’s new RT series of mobile cranes built specifically for the North American market. According to Larry Tate, service and parts manager for Zoomlion, “we’ve used the best components available (and) improved parts availability too.” The RT65 mobile crane features a longer, five-section, 43m boom. “That’s without the jib,” Tate said. “Pull out the jib and the insert and you get another 18m.” This extra reach has extensive benefit to contra